A simple formulation for early-stage cost estimation of building construction projects
This study is aimed at improving a formula that enables easy, correct, and fast estimation of an Early-Stage Cost of Buildings (ESCE). This formula, enabling estimation of ESCE, was developed by the authors based on artificial neural networks and gene expression programming. A quantity survey was co...
Main Authors: | Esra Dobrucali, Ismail Hakki Demir |
---|---|
Format: | Article |
Language: | English |
Published: |
Croatian Association of Civil Engineers
2021-09-01
|
Series: | Građevinar |
Subjects: | |
Online Access: | https://doi.org/10.14256/JCE.3013.2020 |
Similar Items
-
Early Fast Cost Estimates of Sewerage Projects Construction Costs Based on Ensembles of Neural Networks
by: Michał Juszczyk, et al.
Published: (2023-11-01) -
The importance and necessity of cost management of construction projects
by: Alexandra-Marina Barbu, et al.
Published: (2020-12-01) -
Relationship model of constructability and cost performance for Indonesia state building project
by: Sumarno, Pito
Published: (2023) -
Appropriate budget contingency determination for construction projects: State-of-the-art
by: Taher Ammar, et al.
Published: (2023-09-01) -
Early cost estimating for road construction projects using multiple regression techniques
by: Ibrahim Mahamid
Published: (2011-12-01)