Study on the Effect of Acid Corrosion on Proppant Properties
Pre-acid fracturing is an effective technique to improve productivity of tight reservoirs. While acid injection can clean the formation and improve the fracturing performance by reducing the fracture pressure of the reservoir, the chemical reaction of the acid solution with proppant may reduce the c...
Main Authors: | Feng Xu, Kuai Yao, Desheng Li, Dongjin Xu, Huan Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-11-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/15/22/8368 |
Similar Items
-
Productivity of hydraulic fractures with heterogeneous proppant placement and acid etched walls
by: Dimitry Chuprakov, et al.
Published: (2020-09-01) -
Preparation and properties of soluble magnesium alloys
by: JIANG Qian, et al.
Published: (2018-02-01) -
Research on the transport behavior of microparticle proppants inside natural fractures
by: Huifeng Liu, et al.
Published: (2024-06-01) -
Influence of pulverized coal deposition on proppant-filled fracture conductivity
by: ZHOU Yang
Published: (2022-07-01) -
Effect of proppant injection condition on fracture network structure and conductivity
by: Zhifeng Bai, et al.
Published: (2024-08-01)