INTEGRATED PROJECT DELIVERY USING BUILDING INFORMATION MODELING
There are various \ weaknesses in the construction industry which should be improved. Improving these \ weaknesses leads to \ qualitative and \ quantitative improvements of the i...
Main Authors: | V. Shahhosseini, M.H. Sebt, H. Hajarolasvadi |
---|---|
Format: | Article |
Language: | fas |
Published: |
Sharif University of Technology
2017-05-01
|
Series: | مهندسی عمران شریف |
Subjects: | |
Online Access: | https://sjce.journals.sharif.edu/article_2454_f58a8695cf989739cbb6e4bfcdaf2e4f.pdf |
Similar Items
-
EXPERIMENTAL INVESTIGATION OF RING FOOTING BASED ON REINFORCED SOIL WITH GRANULATED RUBBER AND GEOGRID UNDER REPEATED LOADING
by: M.H. keyghobadi, et al.
Published: (2020-05-01) -
LANDSLIDE MONITORING USING WIRELESS SENSOR NETWORKS
by: S. Shoorabi Sani, et al.
Published: (2017-11-01) -
A NEW FORMULATION FOR KINETIC DYNAMIC RELAXATION METHOD BASED ON LAGRANGIAN INTERPOLATION
by: M. Abbasi, et al.
Published: (2021-02-01) -
DETECTION OF DISPERSED DAMAGES OF 2D STEEL FRAMES USING AN ENHANCED MODEL UPDATING METHOD
by: O. Bahar, et al.
Published: (2020-05-01) -
IDENTIFICATION OF DAMAGE IN RIGID CONNECTIONS OF STEEL MOMENT FRAMES IN HEIGHT AND PLAN OF THE STRUCTURES USING MODIFIED MODAL CURVATURE METHOD
by: T. Teimoori, et al.
Published: (2020-05-01)