Thorium-loaded low-power reactor installation operated with super-long fuel residence time

It was established in numerical experiments conducted at the Institute for Safety Research and Reactor Technologies (ISR-2) of the research center Forschungszentrum Jülich (1998–1999) that thorium-plutonium fuel composition ensures due to the presence of anomaly in the dependence of resonance neutro...

Full description

Bibliographic Details
Main Authors: I.V. Shamanin, S.V. Bedenko, Yu.B. Chertkov
Format: Article
Language:English
Published: National Research Nuclear University (MEPhI) 2016-09-01
Series:Nuclear Energy and Technology
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2452303816300814
_version_ 1818446729021751296
author I.V. Shamanin
S.V. Bedenko
Yu.B. Chertkov
author_facet I.V. Shamanin
S.V. Bedenko
Yu.B. Chertkov
author_sort I.V. Shamanin
collection DOAJ
description It was established in numerical experiments conducted at the Institute for Safety Research and Reactor Technologies (ISR-2) of the research center Forschungszentrum Jülich (1998–1999) that thorium-plutonium fuel composition ensures due to the presence of anomaly in the dependence of resonance neutron absorption on the ratio of moderator volume to fuel volume the possibility to organize super-long duration of fuel residence in the cores of VVER-type reactors. Such possibility was demonstrated in the present study for high-temperature thorium-loaded reactor installation with 60MW power. In this case the ratio of moderator volume to the volume of resonance absorber in the reactor core is within the interval of (45–60). It is specifically such type of low-power reactor installations that may constitute the basis of regional power generation in Russia. The purpose of the study was to investigate the neutronics characteristics of thorium-loaded low-power reactor installation with fuel blocks and fuel pellets with different configurations in order to select the reactor core design and the core fuel load ensuring optimal utilization of thorium in it and obtaining maximum possible generation of energy in the course of super-long fuel residence in the core. Implemented studies and numerical experiments were performed using verified computation codes included in the MCU5 [1] and WIMSD5B [2] software packages, updated libraries of evaluated nuclear data (ENDF/B-VII.0, JEFF-3.1.1, JENDL-4.0, ROSFOND, BROND, ABBA [3,4] and others) and multi-group approximations. It was established that thorium-loaded reactor installation with suggested design is the installation operated with fast and intermediate neutrons. Results of calculation allow making the conclusion that reactor installation with suggested configuration of the fuel block and the fuel pellet, as well as with the fuel composition in question can be operated during not less than 3500 effective days at the power level of 60MW without reloading.
first_indexed 2024-12-14T19:52:21Z
format Article
id doaj.art-ea1a734be0444f6fae596d040f94fa28
institution Directory Open Access Journal
issn 2452-3038
language English
last_indexed 2024-12-14T19:52:21Z
publishDate 2016-09-01
publisher National Research Nuclear University (MEPhI)
record_format Article
series Nuclear Energy and Technology
spelling doaj.art-ea1a734be0444f6fae596d040f94fa282022-12-21T22:49:23ZengNational Research Nuclear University (MEPhI)Nuclear Energy and Technology2452-30382016-09-012317217810.1016/j.nucet.2016.07.010Thorium-loaded low-power reactor installation operated with super-long fuel residence timeI.V. ShamaninS.V. BedenkoYu.B. ChertkovIt was established in numerical experiments conducted at the Institute for Safety Research and Reactor Technologies (ISR-2) of the research center Forschungszentrum Jülich (1998–1999) that thorium-plutonium fuel composition ensures due to the presence of anomaly in the dependence of resonance neutron absorption on the ratio of moderator volume to fuel volume the possibility to organize super-long duration of fuel residence in the cores of VVER-type reactors. Such possibility was demonstrated in the present study for high-temperature thorium-loaded reactor installation with 60MW power. In this case the ratio of moderator volume to the volume of resonance absorber in the reactor core is within the interval of (45–60). It is specifically such type of low-power reactor installations that may constitute the basis of regional power generation in Russia. The purpose of the study was to investigate the neutronics characteristics of thorium-loaded low-power reactor installation with fuel blocks and fuel pellets with different configurations in order to select the reactor core design and the core fuel load ensuring optimal utilization of thorium in it and obtaining maximum possible generation of energy in the course of super-long fuel residence in the core. Implemented studies and numerical experiments were performed using verified computation codes included in the MCU5 [1] and WIMSD5B [2] software packages, updated libraries of evaluated nuclear data (ENDF/B-VII.0, JEFF-3.1.1, JENDL-4.0, ROSFOND, BROND, ABBA [3,4] and others) and multi-group approximations. It was established that thorium-loaded reactor installation with suggested design is the installation operated with fast and intermediate neutrons. Results of calculation allow making the conclusion that reactor installation with suggested configuration of the fuel block and the fuel pellet, as well as with the fuel composition in question can be operated during not less than 3500 effective days at the power level of 60MW without reloading.http://www.sciencedirect.com/science/article/pii/S2452303816300814ThoriumPlutoniumThorium-loaded low-power reactor installationSuper-long fuel residence
spellingShingle I.V. Shamanin
S.V. Bedenko
Yu.B. Chertkov
Thorium-loaded low-power reactor installation operated with super-long fuel residence time
Nuclear Energy and Technology
Thorium
Plutonium
Thorium-loaded low-power reactor installation
Super-long fuel residence
title Thorium-loaded low-power reactor installation operated with super-long fuel residence time
title_full Thorium-loaded low-power reactor installation operated with super-long fuel residence time
title_fullStr Thorium-loaded low-power reactor installation operated with super-long fuel residence time
title_full_unstemmed Thorium-loaded low-power reactor installation operated with super-long fuel residence time
title_short Thorium-loaded low-power reactor installation operated with super-long fuel residence time
title_sort thorium loaded low power reactor installation operated with super long fuel residence time
topic Thorium
Plutonium
Thorium-loaded low-power reactor installation
Super-long fuel residence
url http://www.sciencedirect.com/science/article/pii/S2452303816300814
work_keys_str_mv AT ivshamanin thoriumloadedlowpowerreactorinstallationoperatedwithsuperlongfuelresidencetime
AT svbedenko thoriumloadedlowpowerreactorinstallationoperatedwithsuperlongfuelresidencetime
AT yubchertkov thoriumloadedlowpowerreactorinstallationoperatedwithsuperlongfuelresidencetime