Protection System Coordination On 20 kV Distribution Network In Makassar City

This study is a quantitative study that aims to a) describe the coordination of protection systems under abnormal conditions in the distribution network and b) to determine the selectiveity of protection systems in isolating equipment in abnormal conditions of distribution networks. Data setting exi...

Full description

Bibliographic Details
Main Authors: Firdaus Firdaus, Andi Imran, Riana T. Mangesa, Firman Setia Waruru
Format: Article
Language:English
Published: Khairun University, Faculty of Engineering, Department of Electrical Engineering 2023-05-01
Series:Protek: Jurnal Ilmiah Teknik Elektro
Online Access:https://ejournal.unkhair.ac.id/index.php/protk/article/view/4204
_version_ 1797826384199942144
author Firdaus Firdaus
Andi Imran
Riana T. Mangesa
Firman Setia Waruru
author_facet Firdaus Firdaus
Andi Imran
Riana T. Mangesa
Firman Setia Waruru
author_sort Firdaus Firdaus
collection DOAJ
description This study is a quantitative study that aims to a) describe the coordination of protection systems under abnormal conditions in the distribution network and b) to determine the selectiveity of protection systems in isolating equipment in abnormal conditions of distribution networks. Data setting existing rele protection system obtained in PT. PLN (Persero) UP2D Makassar, the data is then processed, simulated, and analyzed using the ETAP 19.0.1 program. The series analyzed in this study is the distribution network PLN ULP Karebosi Paotere refiner with a channel length of 8,234 km, where sktm channel 0.844 km and SUTM 7,390 km, consisting of 33 distribution substations.  The results showed that the flow of short circuit disruption on Hatta buses was: 3-Phase by 3,887 kA, Line-to-Ground by 3,550 kA, Line-to-Line by 3,357 kA, and Line-to-Line-to-Ground by 3,831 kA. To achieve reliability and coordination of protection system equipment resetting rele on recloser Sabutung Set OCR 250 kA, TMS-TD OCR 0.08 s, moment OCR 3x, Sect. Paotere bridge OCR 200 kA, TMS-TD OCR 0.07 s, moment OCR Block, Sect. Hatta OCR 180 kA, TMS-TD OCR 0.05 s, moment OCR Block.
first_indexed 2024-04-09T12:31:39Z
format Article
id doaj.art-ea35ed2db9c6445da1b2853b40940ed7
institution Directory Open Access Journal
issn 2354-8924
2527-9572
language English
last_indexed 2024-04-09T12:31:39Z
publishDate 2023-05-01
publisher Khairun University, Faculty of Engineering, Department of Electrical Engineering
record_format Article
series Protek: Jurnal Ilmiah Teknik Elektro
spelling doaj.art-ea35ed2db9c6445da1b2853b40940ed72023-05-16T04:41:31ZengKhairun University, Faculty of Engineering, Department of Electrical EngineeringProtek: Jurnal Ilmiah Teknik Elektro2354-89242527-95722023-05-01102657110.33387/protk.v10i2.42043366Protection System Coordination On 20 kV Distribution Network In Makassar CityFirdaus Firdaus0Andi Imran1Riana T. Mangesa2Firman Setia Waruru3Universitas Negeri MakassarUniversitas Negeri MakassarUniversitas Negeri MakassarUniversitas Negeri MakassarThis study is a quantitative study that aims to a) describe the coordination of protection systems under abnormal conditions in the distribution network and b) to determine the selectiveity of protection systems in isolating equipment in abnormal conditions of distribution networks. Data setting existing rele protection system obtained in PT. PLN (Persero) UP2D Makassar, the data is then processed, simulated, and analyzed using the ETAP 19.0.1 program. The series analyzed in this study is the distribution network PLN ULP Karebosi Paotere refiner with a channel length of 8,234 km, where sktm channel 0.844 km and SUTM 7,390 km, consisting of 33 distribution substations.  The results showed that the flow of short circuit disruption on Hatta buses was: 3-Phase by 3,887 kA, Line-to-Ground by 3,550 kA, Line-to-Line by 3,357 kA, and Line-to-Line-to-Ground by 3,831 kA. To achieve reliability and coordination of protection system equipment resetting rele on recloser Sabutung Set OCR 250 kA, TMS-TD OCR 0.08 s, moment OCR 3x, Sect. Paotere bridge OCR 200 kA, TMS-TD OCR 0.07 s, moment OCR Block, Sect. Hatta OCR 180 kA, TMS-TD OCR 0.05 s, moment OCR Block.https://ejournal.unkhair.ac.id/index.php/protk/article/view/4204
spellingShingle Firdaus Firdaus
Andi Imran
Riana T. Mangesa
Firman Setia Waruru
Protection System Coordination On 20 kV Distribution Network In Makassar City
Protek: Jurnal Ilmiah Teknik Elektro
title Protection System Coordination On 20 kV Distribution Network In Makassar City
title_full Protection System Coordination On 20 kV Distribution Network In Makassar City
title_fullStr Protection System Coordination On 20 kV Distribution Network In Makassar City
title_full_unstemmed Protection System Coordination On 20 kV Distribution Network In Makassar City
title_short Protection System Coordination On 20 kV Distribution Network In Makassar City
title_sort protection system coordination on 20 kv distribution network in makassar city
url https://ejournal.unkhair.ac.id/index.php/protk/article/view/4204
work_keys_str_mv AT firdausfirdaus protectionsystemcoordinationon20kvdistributionnetworkinmakassarcity
AT andiimran protectionsystemcoordinationon20kvdistributionnetworkinmakassarcity
AT rianatmangesa protectionsystemcoordinationon20kvdistributionnetworkinmakassarcity
AT firmansetiawaruru protectionsystemcoordinationon20kvdistributionnetworkinmakassarcity