The latent causes of rework in floating production storage and offloading projects
There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects a...
Main Authors: | Peter E. D. Love, David John Edwards, Zahir Irani, Nuria Forcada |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2014-06-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | http://journals.vgtu.lt/index.php/JCEM/article/view/3130 |
Similar Items
-
Rework /
by: 359804 Fried, Jason, et al.
Published: (2010) -
Error culture and its impact on rework: An exploration of norms and practices in a transport mega-project
by: Peter E.D. Love, et al.
Published: (2022-05-01) -
Creating a mindfulness to learn from errors: Enablers of rework containment and reduction in construction
by: Peter E.D. Love
Published: (2020-02-01) -
Analysis of direct rework costs in Ukrainian construction
by: Roman Trach, et al.
Published: (2021-06-01) -
Building absorptive capacity in a mega-project program alliance: Learning to mitigate rework
by: Peter E.D. Love, et al.
Published: (2024-04-01)