Perencanaan Ulang Anggaran Biaya dan Waktu Pelaksanaan Gedung Perkuliahan dengan Menggunakan Metode BIM
The speed of completing all stages of the project will cause major complications in the construction management system. The BIM method can integrate all projects that can save costs and time so that it is effective and makes it easier to coordinate in order to streamline the project. The purpose of...
Main Authors: | Rizky Ilham Mardhani, Anik Ratnaningsih, Syamsul Arifin |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2022-06-01
|
Series: | Rekayasa Sipil |
Subjects: | |
Online Access: | https://rekayasasipil.ub.ac.id/index.php/rs/article/view/731 |
Similar Items
-
EVALUASI PERANCANGAN ANGGARAN BIAYA DAN WAKTU MENGGUNAKAN METODE BIM
by: Puteri Khodijatuz Zahro, et al.
Published: (2021-10-01) -
PENINGKATAN EFISIENSI BIAYA PEMBANGUNAN GEDUNG BERTINGKAT DENGAN APLIKASI BUILDING INFORMATION MODELING (BIM) 5D
by: Faqih Nadiya Umam, et al.
Published: (2022-04-01) -
BIM leadership theory for organisational BIM transformation
by: Oluseye Olugboyega
Published: (2022-10-01) -
BIM and geodesy
by: Sabadoš Igor, et al.
Published: (2016-01-01) -
Evaluasi Tingkat Kerusakan dan Perencanaan Estimasi Biaya Perbaikan Bangunan Guna Sustainability Gedung di Universitas Jember (Studi Kasus : Gedung 1 Fakultas Keguruan dan Ilmu Pendidikan (FKIP))
by: Wisnu Eka Nanda, et al.
Published: (2020-07-01)