Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock
The capacity of some busy rail lines is increasingly tight and passenger demand far exceeds the railway capacity. To schedule as many trains as possible in order to satisfy more transportation demands, we studied the capacity-oriented train scheduling problem. While most approaches focus only on inc...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-05-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/10/10/1639 |
_version_ | 1797498156269699072 |
---|---|
author | Wenliang Zhou Sha Li Jing Kang Yu Huang |
author_facet | Wenliang Zhou Sha Li Jing Kang Yu Huang |
author_sort | Wenliang Zhou |
collection | DOAJ |
description | The capacity of some busy rail lines is increasingly tight and passenger demand far exceeds the railway capacity. To schedule as many trains as possible in order to satisfy more transportation demands, we studied the capacity-oriented train scheduling problem. While most approaches focus only on increasing the capacity of the rail line, this research considers both the time-space distribution of transportation demands and the operation and maintenance of rolling stock. To solve this problem, we first constructed a time-space network to describe the time-space path of rolling stock. We then proposed an integer planning model with rolling stock maintenance and the OD service frequency constraints to maximize the number of running arcs in rail sections. After decomposing this model by introducing some Lagrangian multipliers to relax its hard constraints, we proposed a Lagrangian relaxation-based decomposition algorithm, including two path search sub-algorithms for rolling stock to optimize both the relaxed and the feasible solutions. Finally, we conducted a computation study on a practical double-track high-speed railway line to test the performance of this algorithm. It reports that the train timetables and the operation of rolling stock are well managed. |
first_indexed | 2024-03-10T03:29:25Z |
format | Article |
id | doaj.art-ea8c3e87bdac499d8660db93b6d916a8 |
institution | Directory Open Access Journal |
issn | 2227-7390 |
language | English |
last_indexed | 2024-03-10T03:29:25Z |
publishDate | 2022-05-01 |
publisher | MDPI AG |
record_format | Article |
series | Mathematics |
spelling | doaj.art-ea8c3e87bdac499d8660db93b6d916a82023-11-23T12:00:14ZengMDPI AGMathematics2227-73902022-05-011010163910.3390/math10101639Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling StockWenliang Zhou0Sha Li1Jing Kang2Yu Huang3School of Traffic and Transportation Engineering, Central South University, Changsha 410075, ChinaSchool of Traffic and Transportation Engineering, Central South University, Changsha 410075, ChinaSchool of Traffic and Transportation Engineering, Central South University, Changsha 410075, ChinaSchool of Traffic and Transportation Engineering, Central South University, Changsha 410075, ChinaThe capacity of some busy rail lines is increasingly tight and passenger demand far exceeds the railway capacity. To schedule as many trains as possible in order to satisfy more transportation demands, we studied the capacity-oriented train scheduling problem. While most approaches focus only on increasing the capacity of the rail line, this research considers both the time-space distribution of transportation demands and the operation and maintenance of rolling stock. To solve this problem, we first constructed a time-space network to describe the time-space path of rolling stock. We then proposed an integer planning model with rolling stock maintenance and the OD service frequency constraints to maximize the number of running arcs in rail sections. After decomposing this model by introducing some Lagrangian multipliers to relax its hard constraints, we proposed a Lagrangian relaxation-based decomposition algorithm, including two path search sub-algorithms for rolling stock to optimize both the relaxed and the feasible solutions. Finally, we conducted a computation study on a practical double-track high-speed railway line to test the performance of this algorithm. It reports that the train timetables and the operation of rolling stock are well managed.https://www.mdpi.com/2227-7390/10/10/1639train schedulingcapacity-orientedLagrangian relaxationrolling stock maintenanceOD travel demand |
spellingShingle | Wenliang Zhou Sha Li Jing Kang Yu Huang Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock Mathematics train scheduling capacity-oriented Lagrangian relaxation rolling stock maintenance OD travel demand |
title | Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock |
title_full | Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock |
title_fullStr | Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock |
title_full_unstemmed | Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock |
title_short | Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock |
title_sort | capacity oriented train scheduling of high speed railway considering the operation and maintenance of rolling stock |
topic | train scheduling capacity-oriented Lagrangian relaxation rolling stock maintenance OD travel demand |
url | https://www.mdpi.com/2227-7390/10/10/1639 |
work_keys_str_mv | AT wenliangzhou capacityorientedtrainschedulingofhighspeedrailwayconsideringtheoperationandmaintenanceofrollingstock AT shali capacityorientedtrainschedulingofhighspeedrailwayconsideringtheoperationandmaintenanceofrollingstock AT jingkang capacityorientedtrainschedulingofhighspeedrailwayconsideringtheoperationandmaintenanceofrollingstock AT yuhuang capacityorientedtrainschedulingofhighspeedrailwayconsideringtheoperationandmaintenanceofrollingstock |