Market-based generator cost functions for power system test cases
Post-restructuring, generators are dispatched using cleared offers in the day-ahead market in the cyber-physical power system. This study proposes a novel method to design generator cost functions to emulate existing market costs for power system test cases. Cost functions on existing test cases are...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2018-12-01
|
Series: | IET Cyber-Physical Systems |
Subjects: | |
Online Access: | https://digital-library.theiet.org/content/journals/10.1049/iet-cps.2018.5046 |