Research on calculation and optimization method of refrigeration and cooling pipe network in high temperature mine
Adoption of centralized underground refrigeration cooling system in high-temperature mine is affected by the range of mining. The complex chilled water transmission pipeline network leads to inadequate supply of terminal cooling capacity, which significantly affects the cooling effectiveness. In ord...
Main Authors: | Li MA, Yating ZHANG, Shangming LIU, Junchang JIAN, Zhihua QIN, Heng LIU, Chaoyang CHEN |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Coal Science and Technology
2024-02-01
|
Series: | Meitan kexue jishu |
Subjects: | |
Online Access: | http://www.mtkxjs.com.cn/article/doi/10.12438/cst.2023-0426 |
Similar Items
-
Computer simulation of annual work cycle of combined refrigeration system using night radiative cooling
by: A. P. Tsoy, et al.
Published: (2020-10-01) -
Energy conservation in domestic refrigerators by cooling compressor shell – A case study
by: N. Nethaji, et al.
Published: (2017-09-01) -
Design guide for cool thermal storage /
by: Dorgan, Charles E., et al.
Published: (1993) -
Newly Developed Motor Cooling Method Using Refrigerant
by: Hidemasa Fujita, et al.
Published: (2019-06-01) -
Modern refrigeration practice/
by: 303997 King, Guy R.
Published: (1971)