Risk management of a torrential flood construction project using the Monte Carlo simulation
Projects for the regulation of torrent basins carry various unforeseen adverse effects that may result in breached deadlines, increased costs, a reduction of quality etc. The paper presents the basic characteristics and most frequent risks associated with erosion control. Furthermore, it pr...
Main Authors: | Baumgertel Aleksandar, Dragović Nada, Vulević Tijana |
---|---|
Format: | Article |
Language: | srp |
Published: |
Faculty of Forestry, Belgrade
2016-01-01
|
Series: | Glasnik Šumarskog Fakulteta: Univerzitet u Beogradu |
Subjects: | |
Online Access: | http://www.doiserbia.nb.rs/img/doi/0353-4537/2016/0353-45371614029B.pdf |
Similar Items
-
Minimization of direct costs in the construction of torrent control structures
by: Nada Dragović, et al.
Published: (2017-01-01) -
Groundwater Health Risk Assessment Based on Monte Carlo Model Sensitivity Analysis of Cr and As—A Case Study of Yinchuan City
by: Zhiyuan Ma, et al.
Published: (2022-08-01) -
Monte Carlo simulation and finance /
by: 267966 McLeish, Don L.
Published: (2005) -
The Monte Carlo method /
by: Sobol, I. M. (Ilia Meerovich)
Published: (1974) -
Monte Carlo methods /
by: 204054 Kalos, Malvin H., et al.
Published: (2008)