First application of reinforced concrete in Spain and first European application in bridges: The rehabilitation of the Roman bridge of Alcántara
The Alcántara Bridge is one of the most important Roman bridges in the world and has been a Spanish National Monument since 1924. Since its construction, almost two thousand years ago, it has suffered numerous damages due to the passage of time and human action, which has led to different interventi...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2023-12-01
|
Series: | Case Studies in Construction Materials |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2214509523005302 |
_version_ | 1827636322265726976 |
---|---|
author | Juan Pedro Cortés-Pérez Mario Núñez-Fernández Alfonso Cortés-Pérez Montaña Jiménez-Espada |
author_facet | Juan Pedro Cortés-Pérez Mario Núñez-Fernández Alfonso Cortés-Pérez Montaña Jiménez-Espada |
author_sort | Juan Pedro Cortés-Pérez |
collection | DOAJ |
description | The Alcántara Bridge is one of the most important Roman bridges in the world and has been a Spanish National Monument since 1924. Since its construction, almost two thousand years ago, it has suffered numerous damages due to the passage of time and human action, which has led to different interventions. The most important was that carried out by Millán (1856–1860), for the reconstruction of the arch demolished in 1810. During a visit to the bridge, areas with reinforced concrete were observed. Given the areas where it appears, the geometry of the reinforcement and its configuration, is possible to think that it is a very old intervention, which could date from the same period as that carried out by Millán. If so, it would be the first application of reinforced concrete in Spain and one of the first in the world. The aim of this study is to date the intervention and validate the initial hypothesis. To this end, based on a 3D survey of the rehabilitated areas using a drone, a comparative analysis has been carried out with the plans of Millán's project, as well as sheets and photographs from different periods to establish the date of the interventions. Research was also carried out in the archives of the Real Academia de Bellas Artes de San Fernando to gather information on the interventions on the bridge throughout the 19th century. Finally, the geometry and layout of the reinforcement is analysed in relation to the knowledge of reinforced concrete from its first patents worldwide to its widespread application in Spain. These analyses allow us to conclude that the date of the reinforced concrete repairs on the bridge is undoubtedly 1857, which would be the first application in Spain and the first in Europe on bridges. |
first_indexed | 2024-03-09T15:40:24Z |
format | Article |
id | doaj.art-eb0ecb6b034e43c49ff68442dabcbeac |
institution | Directory Open Access Journal |
issn | 2214-5095 |
language | English |
last_indexed | 2024-03-09T15:40:24Z |
publishDate | 2023-12-01 |
publisher | Elsevier |
record_format | Article |
series | Case Studies in Construction Materials |
spelling | doaj.art-eb0ecb6b034e43c49ff68442dabcbeac2023-11-25T04:48:24ZengElsevierCase Studies in Construction Materials2214-50952023-12-0119e02350First application of reinforced concrete in Spain and first European application in bridges: The rehabilitation of the Roman bridge of AlcántaraJuan Pedro Cortés-Pérez0Mario Núñez-Fernández1Alfonso Cortés-Pérez2Montaña Jiménez-Espada3Department of Construction, School of Technology, University of Extremadura, Avda. de la Universidad s/n, 10003 Cáceres, Spain; Corresponding authors.Department of Construction, School of Technology, University of Extremadura, Avda. de la Universidad s/n, 10003 Cáceres, SpainDepartment of Education, Faculty of Legal and Economic Sciences, University Isabel I, C. de Fernán González nº 76, 09003 Burgos, SpainDepartment of Construction, School of Technology, University of Extremadura, Avda. de la Universidad s/n, 10003 Cáceres, SpainThe Alcántara Bridge is one of the most important Roman bridges in the world and has been a Spanish National Monument since 1924. Since its construction, almost two thousand years ago, it has suffered numerous damages due to the passage of time and human action, which has led to different interventions. The most important was that carried out by Millán (1856–1860), for the reconstruction of the arch demolished in 1810. During a visit to the bridge, areas with reinforced concrete were observed. Given the areas where it appears, the geometry of the reinforcement and its configuration, is possible to think that it is a very old intervention, which could date from the same period as that carried out by Millán. If so, it would be the first application of reinforced concrete in Spain and one of the first in the world. The aim of this study is to date the intervention and validate the initial hypothesis. To this end, based on a 3D survey of the rehabilitated areas using a drone, a comparative analysis has been carried out with the plans of Millán's project, as well as sheets and photographs from different periods to establish the date of the interventions. Research was also carried out in the archives of the Real Academia de Bellas Artes de San Fernando to gather information on the interventions on the bridge throughout the 19th century. Finally, the geometry and layout of the reinforcement is analysed in relation to the knowledge of reinforced concrete from its first patents worldwide to its widespread application in Spain. These analyses allow us to conclude that the date of the reinforced concrete repairs on the bridge is undoubtedly 1857, which would be the first application in Spain and the first in Europe on bridges.http://www.sciencedirect.com/science/article/pii/S2214509523005302Alcántara BridgeFirst applicationReinforced concreteRehabilitationHeritage |
spellingShingle | Juan Pedro Cortés-Pérez Mario Núñez-Fernández Alfonso Cortés-Pérez Montaña Jiménez-Espada First application of reinforced concrete in Spain and first European application in bridges: The rehabilitation of the Roman bridge of Alcántara Case Studies in Construction Materials Alcántara Bridge First application Reinforced concrete Rehabilitation Heritage |
title | First application of reinforced concrete in Spain and first European application in bridges: The rehabilitation of the Roman bridge of Alcántara |
title_full | First application of reinforced concrete in Spain and first European application in bridges: The rehabilitation of the Roman bridge of Alcántara |
title_fullStr | First application of reinforced concrete in Spain and first European application in bridges: The rehabilitation of the Roman bridge of Alcántara |
title_full_unstemmed | First application of reinforced concrete in Spain and first European application in bridges: The rehabilitation of the Roman bridge of Alcántara |
title_short | First application of reinforced concrete in Spain and first European application in bridges: The rehabilitation of the Roman bridge of Alcántara |
title_sort | first application of reinforced concrete in spain and first european application in bridges the rehabilitation of the roman bridge of alcantara |
topic | Alcántara Bridge First application Reinforced concrete Rehabilitation Heritage |
url | http://www.sciencedirect.com/science/article/pii/S2214509523005302 |
work_keys_str_mv | AT juanpedrocortesperez firstapplicationofreinforcedconcreteinspainandfirsteuropeanapplicationinbridgestherehabilitationoftheromanbridgeofalcantara AT marionunezfernandez firstapplicationofreinforcedconcreteinspainandfirsteuropeanapplicationinbridgestherehabilitationoftheromanbridgeofalcantara AT alfonsocortesperez firstapplicationofreinforcedconcreteinspainandfirsteuropeanapplicationinbridgestherehabilitationoftheromanbridgeofalcantara AT montanajimenezespada firstapplicationofreinforcedconcreteinspainandfirsteuropeanapplicationinbridgestherehabilitationoftheromanbridgeofalcantara |