Feasibility Maintaining of the Efficiency of Orumieh Water Treatment Plant in the Case of Floating
Orumieh WTP was established based on nominal capacity of 18000 m3/d in 1962. By the last extension, its capacity was increased up to 30,000 m3/d. The raw water is transmitted from the sited intake on the Shahre Chaie River from the sited intake by gravity channel toward the WTP. The different units...
Main Authors: | Yousef Rahimi, Zahra Ghavi Panjeh |
---|---|
Format: | Article |
Language: | English |
Published: |
Water and Wastewater Consulting Engineers Research Development
2005-12-01
|
Series: | آب و فاضلاب |
Online Access: | http://www.wwjournal.ir/article_2496_0c4de696a857f2b891dd0db765b2ad54.pdf |
Similar Items
-
The Effect of Information Technology on Efficiency of Cooperatives Value Chain
Production-Industrial Cooperatives of Orumieh Case Study
by: A Sarafizadeh, et al.
Published: (2011-12-01) -
Conflict Resolution of Water Resources Allocations Using the Game Theoretic Approach: The Case of Orumieh River Basin
by: Mohammad Danesh yazdi, et al.
Published: (2014-05-01) -
Strategic planning for development of tourism capabilities in Urban areas
Case study: city of Orumieh
by: Younes Ghasemi, et al.
Published: (2015-03-01) -
Feasibility analysis of floating photovoltaic power plant in Bangladesh: A case study in Hatirjheel Lake, Dhaka
by: Islam, Md. Imamul, et al.
Published: (2023) -
Contaminant removal efficiency of floating treatment wetlands
by: Shuolin Li, et al.
Published: (2020-01-01)