Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems
In order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy dev...
Main Author: | |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Journal of Shanghai Jiao Tong University
2021-12-01
|
Series: | Shanghai Jiaotong Daxue xuebao |
Subjects: | |
Online Access: | http://xuebao.sjtu.edu.cn/article/2021/1006-2467/1006-2467-55-12-1640.shtml |
_version_ | 1831702515101466624 |
---|---|
author | HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han |
author_facet | HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han |
author_sort | HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han |
collection | DOAJ |
description | In order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy development, net load fluctuation, and the demand of power market reform. Furthermore, it proposes an operating reserve proposal system of East China power grid under the new situation based on the status of typical power systems at home and abroad. The suggested operating reserve system reorganizes and revises the principles of reserve classification, response time, and minimum reserve configuration. The results verify the effectiveness of the proposed operating reserve system through the measurement and analysis of the actual operation data of the East China power grid. |
first_indexed | 2024-12-20T15:23:10Z |
format | Article |
id | doaj.art-ebddec9d562d4f3cbef1ef899aba3e01 |
institution | Directory Open Access Journal |
issn | 1006-2467 |
language | zho |
last_indexed | 2024-12-20T15:23:10Z |
publishDate | 2021-12-01 |
publisher | Editorial Office of Journal of Shanghai Jiao Tong University |
record_format | Article |
series | Shanghai Jiaotong Daxue xuebao |
spelling | doaj.art-ebddec9d562d4f3cbef1ef899aba3e012022-12-21T19:35:57ZzhoEditorial Office of Journal of Shanghai Jiao Tong UniversityShanghai Jiaotong Daxue xuebao1006-24672021-12-0155121640164910.16183/j.cnki.jsjtu.2021.273Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power SystemsHU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han01. East China Branch of State Grid Corporation of China, Shanghai 200120, China;2. Key Laboratory of Control of Power Transmission and Conversion of the Ministry of Education, Shanghai Jiao Tong University, Shanghai 200240, ChinaIn order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy development, net load fluctuation, and the demand of power market reform. Furthermore, it proposes an operating reserve proposal system of East China power grid under the new situation based on the status of typical power systems at home and abroad. The suggested operating reserve system reorganizes and revises the principles of reserve classification, response time, and minimum reserve configuration. The results verify the effectiveness of the proposed operating reserve system through the measurement and analysis of the actual operation data of the East China power grid.http://xuebao.sjtu.edu.cn/article/2021/1006-2467/1006-2467-55-12-1640.shtmloperating reserveeast china power gridminimum reserve configurationmeasurement and analysis |
spellingShingle | HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems Shanghai Jiaotong Daxue xuebao operating reserve east china power grid minimum reserve configuration measurement and analysis |
title | Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems |
title_full | Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems |
title_fullStr | Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems |
title_full_unstemmed | Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems |
title_short | Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems |
title_sort | construction method of an operating reserve system for east china power grid oriented to new power systems |
topic | operating reserve east china power grid minimum reserve configuration measurement and analysis |
url | http://xuebao.sjtu.edu.cn/article/2021/1006-2467/1006-2467-55-12-1640.shtml |
work_keys_str_mv | AT huhongchenxinyiwanglifengtengxiaobiyanzhengxuxiaoyuanwanghan constructionmethodofanoperatingreservesystemforeastchinapowergridorientedtonewpowersystems |