Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems

In order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy dev...

Full description

Bibliographic Details
Main Author: HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han
Format: Article
Language:zho
Published: Editorial Office of Journal of Shanghai Jiao Tong University 2021-12-01
Series:Shanghai Jiaotong Daxue xuebao
Subjects:
Online Access:http://xuebao.sjtu.edu.cn/article/2021/1006-2467/1006-2467-55-12-1640.shtml
_version_ 1831702515101466624
author HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han
author_facet HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han
author_sort HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han
collection DOAJ
description In order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy development, net load fluctuation, and the demand of power market reform. Furthermore, it proposes an operating reserve proposal system of East China power grid under the new situation based on the status of typical power systems at home and abroad. The suggested operating reserve system reorganizes and revises the principles of reserve classification, response time, and minimum reserve configuration. The results verify the effectiveness of the proposed operating reserve system through the measurement and analysis of the actual operation data of the East China power grid.
first_indexed 2024-12-20T15:23:10Z
format Article
id doaj.art-ebddec9d562d4f3cbef1ef899aba3e01
institution Directory Open Access Journal
issn 1006-2467
language zho
last_indexed 2024-12-20T15:23:10Z
publishDate 2021-12-01
publisher Editorial Office of Journal of Shanghai Jiao Tong University
record_format Article
series Shanghai Jiaotong Daxue xuebao
spelling doaj.art-ebddec9d562d4f3cbef1ef899aba3e012022-12-21T19:35:57ZzhoEditorial Office of Journal of Shanghai Jiao Tong UniversityShanghai Jiaotong Daxue xuebao1006-24672021-12-0155121640164910.16183/j.cnki.jsjtu.2021.273Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power SystemsHU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han01. East China Branch of State Grid Corporation of China, Shanghai 200120, China;2. Key Laboratory of Control of Power Transmission and Conversion of the Ministry of Education, Shanghai Jiao Tong University, Shanghai 200240, ChinaIn order to further enhance the active power regulation capacity of East China power grid, this paper analyzes the necessity of constructing an operation reserve system of East China power grid under the new power systems construction from the aspects of receiving end characteristics, new energy development, net load fluctuation, and the demand of power market reform. Furthermore, it proposes an operating reserve proposal system of East China power grid under the new situation based on the status of typical power systems at home and abroad. The suggested operating reserve system reorganizes and revises the principles of reserve classification, response time, and minimum reserve configuration. The results verify the effectiveness of the proposed operating reserve system through the measurement and analysis of the actual operation data of the East China power grid.http://xuebao.sjtu.edu.cn/article/2021/1006-2467/1006-2467-55-12-1640.shtmloperating reserveeast china power gridminimum reserve configurationmeasurement and analysis
spellingShingle HU Hong, CHEN Xinyi, WANG Lifeng, TENG Xiaobi, YAN Zheng, XU Xiaoyuan, WANG Han
Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems
Shanghai Jiaotong Daxue xuebao
operating reserve
east china power grid
minimum reserve configuration
measurement and analysis
title Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems
title_full Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems
title_fullStr Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems
title_full_unstemmed Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems
title_short Construction Method of an Operating Reserve System for East China Power Grid Oriented to New Power Systems
title_sort construction method of an operating reserve system for east china power grid oriented to new power systems
topic operating reserve
east china power grid
minimum reserve configuration
measurement and analysis
url http://xuebao.sjtu.edu.cn/article/2021/1006-2467/1006-2467-55-12-1640.shtml
work_keys_str_mv AT huhongchenxinyiwanglifengtengxiaobiyanzhengxuxiaoyuanwanghan constructionmethodofanoperatingreservesystemforeastchinapowergridorientedtonewpowersystems