Evaluation of pre-jamming indication parameter during blind backfilling technique

Hydraulic blind backfilling is used to reduce subsidence problems above old underground water-logged coal mines. This paper describes experimental research on a fully transparent model of a straight underground mine gallery. An automatic data acquisition system was installed in the model to continuo...

Full description

Bibliographic Details
Main Authors: Susmita Panda, S.K. Pal, P.V.S.N. Murthy
Format: Article
Language:English
Published: Central Mining Institute (Główny Instytut Górnictwa) 2016-01-01
Series:Journal of Sustainable Mining
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2300396016300337
_version_ 1819173193121792000
author Susmita Panda
S.K. Pal
P.V.S.N. Murthy
author_facet Susmita Panda
S.K. Pal
P.V.S.N. Murthy
author_sort Susmita Panda
collection DOAJ
description Hydraulic blind backfilling is used to reduce subsidence problems above old underground water-logged coal mines. This paper describes experimental research on a fully transparent model of a straight underground mine gallery. An automatic data acquisition system was installed in the model to continuously record the sand and water flowrates along with the inlet pressure of the slurry near the model's inlet. Pressure signature graphs and pressure loss curves with bed advancement under different flow conditions are examined. Pressure signature analyses for various flowrates and sand slurry concentrations are conducted to evaluate a pre-jamming indication parameter, which could be used to indicate the arrival of the final stage of filling.
first_indexed 2024-12-22T20:19:11Z
format Article
id doaj.art-ec0cc51366d74572ad1a314c89aedd65
institution Directory Open Access Journal
issn 2300-3960
language English
last_indexed 2024-12-22T20:19:11Z
publishDate 2016-01-01
publisher Central Mining Institute (Główny Instytut Górnictwa)
record_format Article
series Journal of Sustainable Mining
spelling doaj.art-ec0cc51366d74572ad1a314c89aedd652022-12-21T18:13:54ZengCentral Mining Institute (Główny Instytut Górnictwa)Journal of Sustainable Mining2300-39602016-01-0115310010710.1016/j.jsm.2016.11.001Evaluation of pre-jamming indication parameter during blind backfilling techniqueSusmita Panda0S.K. Pal1P.V.S.N. Murthy2Department of Mining Engineering, I.I.T. Kharagpur, West Bengal, 721302, IndiaDepartment of Mining Engineering, I.I.T. Kharagpur, West Bengal, 721302, IndiaDepartment of Mathematics, I.I.T. Kharagpur, West Bengal, 721302, IndiaHydraulic blind backfilling is used to reduce subsidence problems above old underground water-logged coal mines. This paper describes experimental research on a fully transparent model of a straight underground mine gallery. An automatic data acquisition system was installed in the model to continuously record the sand and water flowrates along with the inlet pressure of the slurry near the model's inlet. Pressure signature graphs and pressure loss curves with bed advancement under different flow conditions are examined. Pressure signature analyses for various flowrates and sand slurry concentrations are conducted to evaluate a pre-jamming indication parameter, which could be used to indicate the arrival of the final stage of filling.http://www.sciencedirect.com/science/article/pii/S2300396016300337Subsidence in abandoned underground minesHydraulic gravity blind backfillingData acquisition systemPressure signaturePre-jamming indication parameter
spellingShingle Susmita Panda
S.K. Pal
P.V.S.N. Murthy
Evaluation of pre-jamming indication parameter during blind backfilling technique
Journal of Sustainable Mining
Subsidence in abandoned underground mines
Hydraulic gravity blind backfilling
Data acquisition system
Pressure signature
Pre-jamming indication parameter
title Evaluation of pre-jamming indication parameter during blind backfilling technique
title_full Evaluation of pre-jamming indication parameter during blind backfilling technique
title_fullStr Evaluation of pre-jamming indication parameter during blind backfilling technique
title_full_unstemmed Evaluation of pre-jamming indication parameter during blind backfilling technique
title_short Evaluation of pre-jamming indication parameter during blind backfilling technique
title_sort evaluation of pre jamming indication parameter during blind backfilling technique
topic Subsidence in abandoned underground mines
Hydraulic gravity blind backfilling
Data acquisition system
Pressure signature
Pre-jamming indication parameter
url http://www.sciencedirect.com/science/article/pii/S2300396016300337
work_keys_str_mv AT susmitapanda evaluationofprejammingindicationparameterduringblindbackfillingtechnique
AT skpal evaluationofprejammingindicationparameterduringblindbackfillingtechnique
AT pvsnmurthy evaluationofprejammingindicationparameterduringblindbackfillingtechnique