Evaluation of pre-jamming indication parameter during blind backfilling technique
Hydraulic blind backfilling is used to reduce subsidence problems above old underground water-logged coal mines. This paper describes experimental research on a fully transparent model of a straight underground mine gallery. An automatic data acquisition system was installed in the model to continuo...
Main Authors: | Susmita Panda, S.K. Pal, P.V.S.N. Murthy |
---|---|
Format: | Article |
Language: | English |
Published: |
Central Mining Institute (Główny Instytut Górnictwa)
2016-01-01
|
Series: | Journal of Sustainable Mining |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2300396016300337 |
Similar Items
-
Review of the Backfill Materials in Chinese Underground Coal Mining
by: Junwen Feng, et al.
Published: (2023-03-01) -
Mechanical Analysis of Roof Subsidence Based on Rheological Properties of Solid Backfill Materials
by: Meng Li, et al.
Published: (2018-01-01) -
Determination of the Backfilling Time for the Zinc and Lead Ore Deposits with Application of the BackfillCAD Model
by: Krzysztof Skrzypkowski
Published: (2021-05-01) -
Paste backfill materials for underground mining: Some experiences in Serbia: Part II
by: Kostović Milena
Published: (2020-01-01) -
Ground Stress Analysis and Automation of Workface in Continuous Mining Continuous Backfill Operation
by: Seun A. Ajayi, et al.
Published: (2022-06-01)