The Potential of Bio-Try Briquettes for Biomass Power Plant in Aceh Province – Case Study in South West Aceh, Indonesia

Oil palm waste in the South West Aceh, Indonesia region, has the potential for renewable energies to replace fossil energy. On the basis of previous studies, the mixture of EFB, fiber and shells into bio-try briquettes had an average calorific value of 5000 calories per gram. In this study, the auth...

Full description

Bibliographic Details
Main Authors: Agustiar Agustiar, Tajuddin Bantacut, Moh. Romli, Bambang Pramudya, Muhammad Reza Aulia
Format: Article
Language:English
Published: Polish Society of Ecological Engineering (PTIE) 2023-10-01
Series:Journal of Ecological Engineering
Subjects:
Online Access:http://www.jeeng.net/The-Potential-of-Bio-Try-Briquettes-for-Biomass-Power-Plant-in-Aceh-Province-Case,170079,0,2.html
_version_ 1797739863743660032
author Agustiar Agustiar
Tajuddin Bantacut
Moh. Romli
Bambang Pramudya
Muhammad Reza Aulia
author_facet Agustiar Agustiar
Tajuddin Bantacut
Moh. Romli
Bambang Pramudya
Muhammad Reza Aulia
author_sort Agustiar Agustiar
collection DOAJ
description Oil palm waste in the South West Aceh, Indonesia region, has the potential for renewable energies to replace fossil energy. On the basis of previous studies, the mixture of EFB, fiber and shells into bio-try briquettes had an average calorific value of 5000 calories per gram. In this study, the authors explored the potential of biotry briquettes. Especially for the South West Aceh (Barsela) Region, a Bio-try briquette can generate electricity of 586.152 GWH, meet electricity consumption in Barsela of 584.57 GWH, and electricity surplus of 1.582 GWH. On the basis of the economic feasibility analysis, it was demonstrated that the Internal Rate of Return (IRR) is 22.58%, which surpasses the set interest rate of 12%, the net profit (NBC ratio is 34.39 > 1), and the principal return point (BEP) is below 1 year (< 0.034 years). As for the environmental aspect, the solid waste used can be reduced by 10.94% or 100800 tons per year. The environmental impact caused by the presence of bio-try briquette on the global warning potential (kg CO2 eq) or greenhouse gases on the third mixture of waste is 77,000 kg per day or 77 tons per day.
first_indexed 2024-03-12T14:04:19Z
format Article
id doaj.art-ed26b93b8bb4436fb6342ba0dfd162a0
institution Directory Open Access Journal
issn 2299-8993
language English
last_indexed 2024-03-12T14:04:19Z
publishDate 2023-10-01
publisher Polish Society of Ecological Engineering (PTIE)
record_format Article
series Journal of Ecological Engineering
spelling doaj.art-ed26b93b8bb4436fb6342ba0dfd162a02023-08-21T17:32:56ZengPolish Society of Ecological Engineering (PTIE)Journal of Ecological Engineering2299-89932023-10-01241011512410.12911/22998993/170079170079The Potential of Bio-Try Briquettes for Biomass Power Plant in Aceh Province – Case Study in South West Aceh, IndonesiaAgustiar Agustiar0https://orcid.org/0000-0003-2636-4147Tajuddin Bantacut1https://orcid.org/0000-0002-5982-8983Moh. Romli2Bambang Pramudya3Muhammad Reza Aulia4https://orcid.org/0000-0002-2355-4992Agriculture Faculty, Teuku Umar University, Alue Peunyareng Street, Meulaboh, 23615, IndonesiaDepartment of Agricultural Industrial Technology, IPB University, Raya Dramaga Street, Bogor, West Java, 16680, IndonesiaDepartment of Agricultural Industrial Technology, IPB University, Raya Dramaga Street, Bogor, West Java, 16680, IndonesiaDepartment of Biosystem Science, IPB University, Raya Dramaga Street, Bogor, West Java, 16680, IndonesiaAgriculture Faculty, Teuku Umar University, Alue Peunyareng Street, Meulaboh, 23615, IndonesiaOil palm waste in the South West Aceh, Indonesia region, has the potential for renewable energies to replace fossil energy. On the basis of previous studies, the mixture of EFB, fiber and shells into bio-try briquettes had an average calorific value of 5000 calories per gram. In this study, the authors explored the potential of biotry briquettes. Especially for the South West Aceh (Barsela) Region, a Bio-try briquette can generate electricity of 586.152 GWH, meet electricity consumption in Barsela of 584.57 GWH, and electricity surplus of 1.582 GWH. On the basis of the economic feasibility analysis, it was demonstrated that the Internal Rate of Return (IRR) is 22.58%, which surpasses the set interest rate of 12%, the net profit (NBC ratio is 34.39 > 1), and the principal return point (BEP) is below 1 year (< 0.034 years). As for the environmental aspect, the solid waste used can be reduced by 10.94% or 100800 tons per year. The environmental impact caused by the presence of bio-try briquette on the global warning potential (kg CO2 eq) or greenhouse gases on the third mixture of waste is 77,000 kg per day or 77 tons per day.http://www.jeeng.net/The-Potential-of-Bio-Try-Briquettes-for-Biomass-Power-Plant-in-Aceh-Province-Case,170079,0,2.htmlsolid wastebio-try briquettepower generationelectricity
spellingShingle Agustiar Agustiar
Tajuddin Bantacut
Moh. Romli
Bambang Pramudya
Muhammad Reza Aulia
The Potential of Bio-Try Briquettes for Biomass Power Plant in Aceh Province – Case Study in South West Aceh, Indonesia
Journal of Ecological Engineering
solid waste
bio-try briquette
power generation
electricity
title The Potential of Bio-Try Briquettes for Biomass Power Plant in Aceh Province – Case Study in South West Aceh, Indonesia
title_full The Potential of Bio-Try Briquettes for Biomass Power Plant in Aceh Province – Case Study in South West Aceh, Indonesia
title_fullStr The Potential of Bio-Try Briquettes for Biomass Power Plant in Aceh Province – Case Study in South West Aceh, Indonesia
title_full_unstemmed The Potential of Bio-Try Briquettes for Biomass Power Plant in Aceh Province – Case Study in South West Aceh, Indonesia
title_short The Potential of Bio-Try Briquettes for Biomass Power Plant in Aceh Province – Case Study in South West Aceh, Indonesia
title_sort potential of bio try briquettes for biomass power plant in aceh province case study in south west aceh indonesia
topic solid waste
bio-try briquette
power generation
electricity
url http://www.jeeng.net/The-Potential-of-Bio-Try-Briquettes-for-Biomass-Power-Plant-in-Aceh-Province-Case,170079,0,2.html
work_keys_str_mv AT agustiaragustiar thepotentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT tajuddinbantacut thepotentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT mohromli thepotentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT bambangpramudya thepotentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT muhammadrezaaulia thepotentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT agustiaragustiar potentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT tajuddinbantacut potentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT mohromli potentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT bambangpramudya potentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia
AT muhammadrezaaulia potentialofbiotrybriquettesforbiomasspowerplantinacehprovincecasestudyinsouthwestacehindonesia