A CBM development well type optimization method based on the long-run marginal cost

Reasonable optimization of development well type is the prerequisite to realize the economic and effective development of coalbed methane (CBM). However, the existing CBM development well type optimization methods are disadvantageous in many aspects. CBM is a kind of typical unconventional natural g...

Full description

Bibliographic Details
Main Authors: Youjin Dai, Shiqun Li, Liangyu Xia, Jingxin Li, Yang Lü
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2019-04-01
Series:Natural Gas Industry B
Online Access:http://www.sciencedirect.com/science/article/pii/S2352854019300233
_version_ 1797282050699427840
author Youjin Dai
Shiqun Li
Liangyu Xia
Jingxin Li
Yang Lü
author_facet Youjin Dai
Shiqun Li
Liangyu Xia
Jingxin Li
Yang Lü
author_sort Youjin Dai
collection DOAJ
description Reasonable optimization of development well type is the prerequisite to realize the economic and effective development of coalbed methane (CBM). However, the existing CBM development well type optimization methods are disadvantageous in many aspects. CBM is a kind of typical unconventional natural gas resource, and its study focuses on single-well evaluation. In this paper, the assessment method and the evaluation index (EI) for CBM development well type optimization based on the long-run marginal cost (LRMC) were constructed on the basis of CBM characteristics from the perspective of economic feasibility. Then, the corresponding decision making criteria were established. Finally, this newly developed method was applied to the well-type optimization of different development blocks in two important CBM development basins in China. And the following research and application results were obtained. First, under the current technical and economic conditions, both directional well and horizontal well are economically feasible to the development of Block A in the Qinshui Basin and Block B in eastern margin of the Ordos Basin, and the economically optimal well type is a horizontal well in Block A and a directional well in Block B. Second, compared with single-well steady daily gas production and single-well investment, the evaluation results on the schemes of different well types present critical value, above which the economic benefit of different schemes are equivalent. Third, EI of different well types is affected by many factors, e.g. geological characteristic of gas reservoirs, single-well production profile, CBM selling price, investment and cost. Therefore, it is necessary to carry out dynamic analysis and update in time based on the change of various influential factors so as to ensure the rationality of decision-making. In conclusion, this newly developed method is intrinsically consistent with traditional evaluation methods, and it is more advantageous with strong operability, intuitive evaluation results and quick and accurate optimization of CBM development well types. Keywords: Coalbed methane (CBM), Long-run marginal cost (LRMC), Development well, Well-type optimization, Directional wells, Horizontal wells, Surface development, Decision making criteria, Critical point
first_indexed 2024-03-07T17:06:22Z
format Article
id doaj.art-ed3a96e10efb4335ae23cb892d527447
institution Directory Open Access Journal
issn 2352-8540
language English
last_indexed 2024-03-07T17:06:22Z
publishDate 2019-04-01
publisher KeAi Communications Co., Ltd.
record_format Article
series Natural Gas Industry B
spelling doaj.art-ed3a96e10efb4335ae23cb892d5274472024-03-03T02:40:11ZengKeAi Communications Co., Ltd.Natural Gas Industry B2352-85402019-04-0162109115A CBM development well type optimization method based on the long-run marginal costYoujin Dai0Shiqun Li1Liangyu Xia2Jingxin Li3Yang Lü4PetroChina Coalbed Methane Co., Ltd., Beijing 100028, China; Corresponding author.China Petroleum International Exploration and Development Co., Ltd., Beijing 100037, ChinaSchool of Business Administration, China University of Petroleum, Beijing 102249, ChinaPetroChina Coalbed Methane Co., Ltd., Beijing 100028, ChinaPetroChina Planning and Engineering Institute, Beijing 100083, ChinaReasonable optimization of development well type is the prerequisite to realize the economic and effective development of coalbed methane (CBM). However, the existing CBM development well type optimization methods are disadvantageous in many aspects. CBM is a kind of typical unconventional natural gas resource, and its study focuses on single-well evaluation. In this paper, the assessment method and the evaluation index (EI) for CBM development well type optimization based on the long-run marginal cost (LRMC) were constructed on the basis of CBM characteristics from the perspective of economic feasibility. Then, the corresponding decision making criteria were established. Finally, this newly developed method was applied to the well-type optimization of different development blocks in two important CBM development basins in China. And the following research and application results were obtained. First, under the current technical and economic conditions, both directional well and horizontal well are economically feasible to the development of Block A in the Qinshui Basin and Block B in eastern margin of the Ordos Basin, and the economically optimal well type is a horizontal well in Block A and a directional well in Block B. Second, compared with single-well steady daily gas production and single-well investment, the evaluation results on the schemes of different well types present critical value, above which the economic benefit of different schemes are equivalent. Third, EI of different well types is affected by many factors, e.g. geological characteristic of gas reservoirs, single-well production profile, CBM selling price, investment and cost. Therefore, it is necessary to carry out dynamic analysis and update in time based on the change of various influential factors so as to ensure the rationality of decision-making. In conclusion, this newly developed method is intrinsically consistent with traditional evaluation methods, and it is more advantageous with strong operability, intuitive evaluation results and quick and accurate optimization of CBM development well types. Keywords: Coalbed methane (CBM), Long-run marginal cost (LRMC), Development well, Well-type optimization, Directional wells, Horizontal wells, Surface development, Decision making criteria, Critical pointhttp://www.sciencedirect.com/science/article/pii/S2352854019300233
spellingShingle Youjin Dai
Shiqun Li
Liangyu Xia
Jingxin Li
Yang Lü
A CBM development well type optimization method based on the long-run marginal cost
Natural Gas Industry B
title A CBM development well type optimization method based on the long-run marginal cost
title_full A CBM development well type optimization method based on the long-run marginal cost
title_fullStr A CBM development well type optimization method based on the long-run marginal cost
title_full_unstemmed A CBM development well type optimization method based on the long-run marginal cost
title_short A CBM development well type optimization method based on the long-run marginal cost
title_sort cbm development well type optimization method based on the long run marginal cost
url http://www.sciencedirect.com/science/article/pii/S2352854019300233
work_keys_str_mv AT youjindai acbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT shiqunli acbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT liangyuxia acbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT jingxinli acbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT yanglu acbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT youjindai cbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT shiqunli cbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT liangyuxia cbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT jingxinli cbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost
AT yanglu cbmdevelopmentwelltypeoptimizationmethodbasedonthelongrunmarginalcost