Simulation of Mosul Dam Reservoir Operation for Irrigation and Hydropower Generation
The current research aims to build a simulation model to study the effect of Jazeera irrigation projects (North, East and South) water requirements on hydroelectric power generation from Mosul dam hydropower plant. The simulation was applied from January 1988 to December 2006 on a monthly basis. A s...
Main Authors: | Baraa Jebbo, Taymoor Awchi |
---|---|
Format: | Article |
Language: | English |
Published: |
Unviversity of Technology- Iraq
2019-04-01
|
Series: | Engineering and Technology Journal |
Subjects: | |
Online Access: | https://etj.uotechnology.edu.iq/article_168919_b900e6dbd043a9e284ec35d4627b2376.pdf |
Similar Items
-
Multi-purpose reservoir operation concomitant with estimating hydropower potential using multifarious hydrological models
by: Yordanos Mekuriaw Meskr, et al.
Published: (2024-01-01) -
Management and Simulation of the Latian Multi-purpose Reservoir Dam and Its Performance Evaluation Based on the Operation Policy on Daily Time Scale
by: M. Babaei, et al.
Published: (2023-08-01) -
Simulation-Optimization of Tarbela Reservoir Operation to Enhance Multiple Benefits and to Achieve Sustainable Development Goals
by: Muhammad Mohsin Munir, et al.
Published: (2022-08-01) -
OPERATION OF MOSUL – DOKAN RESERVOIRS AND SAMARRA BARRAGE USING HEC – RES.SIM MODEL DURING FLOOD PERIOD
by: Thabet M.Abdulateef, et al.
Published: (2022-03-01) -
OPERATION OF MOSUL – DOKAN RESERVOIRS AND SAMARRA BARRAGE USING HEC – RES.SIM MODEL DURING FLOOD PERIOD
by: Thabet M.Abdulateef, et al.
Published: (2022-03-01)