Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja
The Additional Mining Design for coal exploitation at the open pit "Potrlica" - Pljevlja for the period 2020 - 2025, has defined the exploitation system important parameters and development of the open pit. Among others, for the first half of 2022, it is planned to move the crushing plant...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Mining and Metallurgy Institute, Bor
2021-01-01
|
Series: | Mining and Metallurgy Engineering Bor |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2021/2334-88362101075B.pdf |
_version_ | 1827294796008390656 |
---|---|
author | Bugarin Dejan Stanić Nikola Gomilanović Miljan Doderović Aleksandar Stanković Tanja |
author_facet | Bugarin Dejan Stanić Nikola Gomilanović Miljan Doderović Aleksandar Stanković Tanja |
author_sort | Bugarin Dejan |
collection | DOAJ |
description | The Additional Mining Design for coal exploitation at the open pit "Potrlica" - Pljevlja for the period 2020 - 2025, has defined the exploitation system important parameters and development of the open pit. Among others, for the first half of 2022, it is planned to move the crushing plant to a new position, in a direction of the excavation front. Generally, the new position of the crushing plant has been verified within several project and study documents. Nevertheless, there is a need for precise definition of the crushing plant positions and conveyors within the DTO system in order to the create favorable and safe working conditions for mechanization on the loading plateau of the crusher, to provide a more favorable position of the crusher with the aim of easier plateau drainage and a more convenient approach to the crusher for easier maintenance, and to minimize the costs of relocation to a new position while respecting the projected dynamics of relocation works. In order to ensure the fulfillment of the set goals, a techno-economic analysis of the variants of a micro location of the crushing plant at this open pit was performed with an overview given in this paper. |
first_indexed | 2024-04-24T14:09:16Z |
format | Article |
id | doaj.art-ed443e5510744c2ba424f50d7d509319 |
institution | Directory Open Access Journal |
issn | 2334-8836 2406-1395 |
language | English |
last_indexed | 2024-04-24T14:09:16Z |
publishDate | 2021-01-01 |
publisher | Mining and Metallurgy Institute, Bor |
record_format | Article |
series | Mining and Metallurgy Engineering Bor |
spelling | doaj.art-ed443e5510744c2ba424f50d7d5093192024-04-03T09:41:48ZengMining and Metallurgy Institute, BorMining and Metallurgy Engineering Bor2334-88362406-13952021-01-0120211-2758610.5937/mmeb2101075B2334-88362101075BTechnical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, PljevljaBugarin Dejan0Stanić Nikola1Gomilanović Miljan2https://orcid.org/0000-0002-1209-7423Doderović Aleksandar3https://orcid.org/0000-0003-3665-6784Stanković Tanja4https://orcid.org/0000-0002-2714-7016Mining and Metallurgy Institute, Bor, SerbiaMining and Metallurgy Institute, Bor, SerbiaMining and Metallurgy Institute, Bor, SerbiaMining and Metallurgy Institute, Bor, SerbiaMining and Metallurgy Institute, Bor, SerbiaThe Additional Mining Design for coal exploitation at the open pit "Potrlica" - Pljevlja for the period 2020 - 2025, has defined the exploitation system important parameters and development of the open pit. Among others, for the first half of 2022, it is planned to move the crushing plant to a new position, in a direction of the excavation front. Generally, the new position of the crushing plant has been verified within several project and study documents. Nevertheless, there is a need for precise definition of the crushing plant positions and conveyors within the DTO system in order to the create favorable and safe working conditions for mechanization on the loading plateau of the crusher, to provide a more favorable position of the crusher with the aim of easier plateau drainage and a more convenient approach to the crusher for easier maintenance, and to minimize the costs of relocation to a new position while respecting the projected dynamics of relocation works. In order to ensure the fulfillment of the set goals, a techno-economic analysis of the variants of a micro location of the crushing plant at this open pit was performed with an overview given in this paper.https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2021/2334-88362101075B.pdfconveyorcoststechno-economic evaluation |
spellingShingle | Bugarin Dejan Stanić Nikola Gomilanović Miljan Doderović Aleksandar Stanković Tanja Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja Mining and Metallurgy Engineering Bor conveyor costs techno-economic evaluation |
title | Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja |
title_full | Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja |
title_fullStr | Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja |
title_full_unstemmed | Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja |
title_short | Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja |
title_sort | technical economic analysis of variants of a micro location for the dto crushing plant of the dto system and connecting conveyor t1 at the open pit potrlica pljevlja |
topic | conveyor costs techno-economic evaluation |
url | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2021/2334-88362101075B.pdf |
work_keys_str_mv | AT bugarindejan technicaleconomicanalysisofvariantsofamicrolocationforthedtocrushingplantofthedtosystemandconnectingconveyort1attheopenpitpotrlicapljevlja AT stanicnikola technicaleconomicanalysisofvariantsofamicrolocationforthedtocrushingplantofthedtosystemandconnectingconveyort1attheopenpitpotrlicapljevlja AT gomilanovicmiljan technicaleconomicanalysisofvariantsofamicrolocationforthedtocrushingplantofthedtosystemandconnectingconveyort1attheopenpitpotrlicapljevlja AT doderovicaleksandar technicaleconomicanalysisofvariantsofamicrolocationforthedtocrushingplantofthedtosystemandconnectingconveyort1attheopenpitpotrlicapljevlja AT stankovictanja technicaleconomicanalysisofvariantsofamicrolocationforthedtocrushingplantofthedtosystemandconnectingconveyort1attheopenpitpotrlicapljevlja |