A Causation Analysis of Chinese Subway Construction Accidents Based on Fault Tree Analysis-Bayesian Network
Clarifying the causes of subway construction accidents has an important impact on reducing the probability of accidents and protecting workers’ lives and public property to a greater extent. A total of 138 investigation records of subway construction accidents from 2000 to 2020 were collected in thi...
Main Authors: | Zijun Qie, Huijiao Yan |
---|---|
Format: | Article |
Language: | English |
Published: |
Frontiers Media S.A.
2022-06-01
|
Series: | Frontiers in Psychology |
Subjects: | |
Online Access: | https://www.frontiersin.org/articles/10.3389/fpsyg.2022.887073/full |
Similar Items
-
Accidents in transportation and subway tunnels : construction to operation /
by: Vlasov, S. N., author, et al.
Published: (2001) -
Dynamic Safety Analysis CNG Stations Using Fault Tree Approach and Bayesian Network
by: Tahereh Eskandari, et al.
Published: (2019-12-01) -
Fall risk assessment of bridge construction using Bayesian network transferring from fault tree analysis
by: Tung-Tsan Chen, et al.
Published: (2017-02-01) -
Displacement Monitoring of Subway Tracks and Tunnels According to Adjacent Construction
by: Jung-Youl Choi, et al.
Published: (2024-02-01) -
Nonlinear Dynamics Analysis of Subway Gear Transmission System with Fault Parameter
by: Sun Ran, et al.
Published: (2018-01-01)