Assessment of High-Electrification UK Scenarios with Varying Levels of Nuclear Power and Associated Post-Fault Behaviour
Renewable integration into the electricity system of Great Britain (GB) is causing considerable demand for additional flexibility from plants. In particular, a considerable share of this flexibility may be dispatched to secure post-fault transient frequency dynamics. Pursuant to the unprecedented ch...
Main Authors: | Mohamed Hadri, Vincenzo Trovato, Agnes Bialecki, Bruno Merk, Aiden Peakman |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-03-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/14/6/1780 |
Similar Items
-
The Potential of Pressurised Water Reactors to Provide Flexible Response in Future Electricity Grids
by: Aiden Peakman, et al.
Published: (2020-02-01) -
The Role of Nuclear Power in Meeting Current and Future Industrial Process Heat Demands
by: Aiden Peakman, et al.
Published: (2019-09-01) -
On a Roadmap for Future Industrial Nuclear Reactor Core Simulation in the U.K. to Support the Nuclear Renaissance
by: Bruno Merk, et al.
Published: (2018-12-01) -
Flexible Synthetic Inertia Optimization in Modern Power Systems
by: Peter Makolo, et al.
Published: (2024-01-01) -
Scrutinizing the Intermittency of Renewable Energy in a Long-Term Planning Model via Combining Direct Integration and Soft-Linking Methods for Colombia’s Power System
by: Ahmed Younis, et al.
Published: (2022-10-01)