Balancing the Average Weighted Completion Times in Large-Scale Two-Agent Scheduling Problems: An Evolutionary-Type Computational Study
The problem of balancing the average weighted completion times of two classes of jobs is an NP-hard scheduling problem that was very recently introduced in the literature. Interpreted as a cooperative-type two-agent single-machine problem, its applications are in various practical contexts such as i...
Main Author: | Matteo Avolio |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-09-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/11/19/4034 |
Similar Items
-
An Improved Cuckoo Search Algorithm under Bottleneck-Degree-Based Search Guidance for Large-Scale Inter-Cell Scheduling Optimization
by: Peixuan Yang, et al.
Published: (2024-01-01) -
Genetic algorithm-tabu search for mobile agents measurement scheduling in wireless sensor networks
by: WANG Sheng, et al.
Published: (2008-01-01) -
Genetic algorithm-tabu search for mobile agents measurement scheduling in wireless sensor networks
by: WANG Sheng, et al.
Published: (2008-01-01) -
Two-Agent Pareto-Scheduling of Minimizing Total Weighted Completion Time and Total Weighted Late Work
by: Yuan Zhang, et al.
Published: (2020-11-01) -
Adaptive Large Neighborhood Search to Solve Multi-Level Scheduling and Assignment Problems in Broiler Farms
by: Natthanan Praseeratasang, et al.
Published: (2019-06-01)