CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts
Brattice walls in mine shafts are used for various purposes, for example, permanent brattice walls can be used to separate ventilation sections. They can be also used in the case of modernization of the hoisting system, as it is in Shaft no. 1 of the Szczygłowice department, part of the Knurów-Szczy...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-11-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/14/21/7239 |
_version_ | 1797410995923058688 |
---|---|
author | Tomasz Rokita Paweł Kamiński Hubert Ruta Zbigniew Szkudlarek |
author_facet | Tomasz Rokita Paweł Kamiński Hubert Ruta Zbigniew Szkudlarek |
author_sort | Tomasz Rokita |
collection | DOAJ |
description | Brattice walls in mine shafts are used for various purposes, for example, permanent brattice walls can be used to separate ventilation sections. They can be also used in the case of modernization of the hoisting system, as it is in Shaft no. 1 of the Szczygłowice department, part of the Knurów-Szczyłowice coal mine. To shorten the time and reduce costs of the hoist modernization, the shaft is to be partitioned into two sections—with the hoist operating in one of them and another one being modernized in the other section. The new construction of the light brattice wall was designed for this purpose. To prove its usefulness and safety it was tested in the laboratory and computer simulations. The following paper presents CFD simulations of the brattice—its methodology and results together with an overview of works to be conducted in the shaft. |
first_indexed | 2024-03-09T04:38:35Z |
format | Article |
id | doaj.art-ef1a231611904900808a577c1f10737e |
institution | Directory Open Access Journal |
issn | 1996-1073 |
language | English |
last_indexed | 2024-03-09T04:38:35Z |
publishDate | 2021-11-01 |
publisher | MDPI AG |
record_format | Article |
series | Energies |
spelling | doaj.art-ef1a231611904900808a577c1f10737e2023-12-03T13:25:12ZengMDPI AGEnergies1996-10732021-11-011421723910.3390/en14217239CFD Simulations of the New Construction of Light Brattice Wall for Mine ShaftsTomasz Rokita0Paweł Kamiński1Hubert Ruta2Zbigniew Szkudlarek3Department of Machinery Engineering and Transport, Faculty of Mechanical Engineering and Robotics, AGH University of Science and Technology, Adama Mickiewicza Ave. 30, 30-059 Krakow, PolandDepartment of Mining Engineering, Faculty of Civil Engineering and Resource Management, AGH University of Science and Technology, 30-059 Krakow, PolandDepartment of Machinery Engineering and Transport, Faculty of Mechanical Engineering and Robotics, AGH University of Science and Technology, Adama Mickiewicza Ave. 30, 30-059 Krakow, PolandDivision of Machines and Equipment, KOMAG Institute of Mining Technology, 44-101 Gliwice, PolandBrattice walls in mine shafts are used for various purposes, for example, permanent brattice walls can be used to separate ventilation sections. They can be also used in the case of modernization of the hoisting system, as it is in Shaft no. 1 of the Szczygłowice department, part of the Knurów-Szczyłowice coal mine. To shorten the time and reduce costs of the hoist modernization, the shaft is to be partitioned into two sections—with the hoist operating in one of them and another one being modernized in the other section. The new construction of the light brattice wall was designed for this purpose. To prove its usefulness and safety it was tested in the laboratory and computer simulations. The following paper presents CFD simulations of the brattice—its methodology and results together with an overview of works to be conducted in the shaft.https://www.mdpi.com/1996-1073/14/21/7239brattice wallcomposites for mining industrymine shafthoisting system modernization |
spellingShingle | Tomasz Rokita Paweł Kamiński Hubert Ruta Zbigniew Szkudlarek CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts Energies brattice wall composites for mining industry mine shaft hoisting system modernization |
title | CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts |
title_full | CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts |
title_fullStr | CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts |
title_full_unstemmed | CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts |
title_short | CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts |
title_sort | cfd simulations of the new construction of light brattice wall for mine shafts |
topic | brattice wall composites for mining industry mine shaft hoisting system modernization |
url | https://www.mdpi.com/1996-1073/14/21/7239 |
work_keys_str_mv | AT tomaszrokita cfdsimulationsofthenewconstructionoflightbratticewallformineshafts AT pawełkaminski cfdsimulationsofthenewconstructionoflightbratticewallformineshafts AT hubertruta cfdsimulationsofthenewconstructionoflightbratticewallformineshafts AT zbigniewszkudlarek cfdsimulationsofthenewconstructionoflightbratticewallformineshafts |