Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links
A road construction project has a significant effect on traffic congestion and operational performance of the project corridor and connecting street links. However, not many researchers focused on travel time performance-based measures to assess the effect of a road construction project on the proje...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2021-01-01
|
Series: | Urban, Planning and Transport Research |
Subjects: | |
Online Access: | http://dx.doi.org/10.1080/21650020.2021.1942186 |
_version_ | 1819280998362251264 |
---|---|
author | Venu Madhav Kukkapalli Srinivas S. Pulugurtha |
author_facet | Venu Madhav Kukkapalli Srinivas S. Pulugurtha |
author_sort | Venu Madhav Kukkapalli |
collection | DOAJ |
description | A road construction project has a significant effect on traffic congestion and operational performance of the project corridor and connecting street links. However, not many researchers focused on travel time performance-based measures to assess the effect of a road construction project on the project corridor and connecting street links. Therefore, travel time data for a freeway road resurfacing project on 100 links within its vicinity were gathered and processed to assess the effect on freeway and connecting arterial street links. A paired t-test was used to examine the differences in means between the before and during road resurfacing project period travel time performance-based measures. There is a significant difference in travel time performance-based measures before and during the road resurfacing project period on freeway links and connecting arterial links. Their significance varied by the time-of-the-day and day-of-the-week on the freeway and connecting arterial links. The average travel time, planning time, and travel time index can consistently explain the effect of a road resurfacing (construction) project on transportation system performance when compared to buffer time and buffer time index. The findings can be used to enhance temporary traffic control practices in the vicinity of road construction projects. |
first_indexed | 2024-12-24T00:52:42Z |
format | Article |
id | doaj.art-ef30c6bb07724b378a1e46c5238ebbaf |
institution | Directory Open Access Journal |
issn | 2165-0020 |
language | English |
last_indexed | 2024-12-24T00:52:42Z |
publishDate | 2021-01-01 |
publisher | Taylor & Francis Group |
record_format | Article |
series | Urban, Planning and Transport Research |
spelling | doaj.art-ef30c6bb07724b378a1e46c5238ebbaf2022-12-21T17:23:33ZengTaylor & Francis GroupUrban, Planning and Transport Research2165-00202021-01-019131933510.1080/21650020.2021.19421861942186Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street linksVenu Madhav Kukkapalli0Srinivas S. Pulugurtha1The University of North Carolina at CharlotteThe University of North Carolina at CharlotteA road construction project has a significant effect on traffic congestion and operational performance of the project corridor and connecting street links. However, not many researchers focused on travel time performance-based measures to assess the effect of a road construction project on the project corridor and connecting street links. Therefore, travel time data for a freeway road resurfacing project on 100 links within its vicinity were gathered and processed to assess the effect on freeway and connecting arterial street links. A paired t-test was used to examine the differences in means between the before and during road resurfacing project period travel time performance-based measures. There is a significant difference in travel time performance-based measures before and during the road resurfacing project period on freeway links and connecting arterial links. Their significance varied by the time-of-the-day and day-of-the-week on the freeway and connecting arterial links. The average travel time, planning time, and travel time index can consistently explain the effect of a road resurfacing (construction) project on transportation system performance when compared to buffer time and buffer time index. The findings can be used to enhance temporary traffic control practices in the vicinity of road construction projects.http://dx.doi.org/10.1080/21650020.2021.1942186road construction projectresurfacingtravel timepaired t-testfreewayarterial |
spellingShingle | Venu Madhav Kukkapalli Srinivas S. Pulugurtha Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links Urban, Planning and Transport Research road construction project resurfacing travel time paired t-test freeway arterial |
title | Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links |
title_full | Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links |
title_fullStr | Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links |
title_full_unstemmed | Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links |
title_short | Comparing travel time performance-based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links |
title_sort | comparing travel time performance based measures to assess the effect of a freeway road construction project on freeway and connecting arterial street links |
topic | road construction project resurfacing travel time paired t-test freeway arterial |
url | http://dx.doi.org/10.1080/21650020.2021.1942186 |
work_keys_str_mv | AT venumadhavkukkapalli comparingtraveltimeperformancebasedmeasurestoassesstheeffectofafreewayroadconstructionprojectonfreewayandconnectingarterialstreetlinks AT srinivasspulugurtha comparingtraveltimeperformancebasedmeasurestoassesstheeffectofafreewayroadconstructionprojectonfreewayandconnectingarterialstreetlinks |