Perencanaan Sistem Instalasi Plambing Air Bersih dan Air Limbah di Apartemen Menara Cibinong Tower C

The high population growth demands the need for housing, so apartments are considered as a solution in meeting the need for housing. Basically, every business or development activity has an impact on the environment, both positive and negative. Plumbing systems for clean water, waste water and venti...

Full description

Bibliographic Details
Main Authors: Rhezaldy Pradestama Putra, Kancitra Pharmawati, Anindito Nurprabowo
Format: Article
Language:English
Published: University of Serambi Mekkah 2021-01-01
Series:Jurnal Serambi Engineering
Subjects:
Online Access:https://ojs.serambimekkah.ac.id/jse/article/view/4092
_version_ 1811315808866926592
author Rhezaldy Pradestama Putra
Kancitra Pharmawati
Anindito Nurprabowo
author_facet Rhezaldy Pradestama Putra
Kancitra Pharmawati
Anindito Nurprabowo
author_sort Rhezaldy Pradestama Putra
collection DOAJ
description The high population growth demands the need for housing, so apartments are considered as a solution in meeting the need for housing. Basically, every business or development activity has an impact on the environment, both positive and negative. Plumbing systems for clean water, waste water and ventilation in buildings can reduce the possibility of environmental pollution and health problems. This study aims to meet the needs of clean water and maintain the sanitation health of building occupants. The reference method is SNI 7065-2005 for calculating the need for clean water and SNI 8153-2015 for determining the dimensions of clean water pipes. The calculation results the population in the Cibinong Tower C apartment building is 957 people with a total need for clean water of 87.95 m3/ day. In meeting the daily needs of clean water in the planning building, a ground water tank with a capacity of 120 m3 is used and a roof tank is used to fulfill water needs at certain hours with a capacity of 49 m3. To distribute water from GWT to RT using a pump with a power capacity of 33.44 Kwatt. The diameter of the clean water pipe uses dimensions from 20 mm to 125 mm. For blackwater wastewater using pipes with dimensions of 60 mm–140 mm and for greywater wastewater using pipes with dimensions of 32 mm–114 mm, while for ventpipes using pipe dimensions of 42 mm–114 mm
first_indexed 2024-04-13T11:36:52Z
format Article
id doaj.art-ef3904ccec4140a084f4acc9e9b2d9c4
institution Directory Open Access Journal
issn 2528-3561
2541-1934
language English
last_indexed 2024-04-13T11:36:52Z
publishDate 2021-01-01
publisher University of Serambi Mekkah
record_format Article
series Jurnal Serambi Engineering
spelling doaj.art-ef3904ccec4140a084f4acc9e9b2d9c42022-12-22T02:48:25ZengUniversity of Serambi MekkahJurnal Serambi Engineering2528-35612541-19342021-01-017110.32672/jse.v7i1.40923153Perencanaan Sistem Instalasi Plambing Air Bersih dan Air Limbah di Apartemen Menara Cibinong Tower CRhezaldy Pradestama Putra0Kancitra PharmawatiAnindito NurprabowoJurusan Teknik Lingkungan, Fakultas Teknil Sipil dan Perencanaan, Institut Teknologi Nasional BandungThe high population growth demands the need for housing, so apartments are considered as a solution in meeting the need for housing. Basically, every business or development activity has an impact on the environment, both positive and negative. Plumbing systems for clean water, waste water and ventilation in buildings can reduce the possibility of environmental pollution and health problems. This study aims to meet the needs of clean water and maintain the sanitation health of building occupants. The reference method is SNI 7065-2005 for calculating the need for clean water and SNI 8153-2015 for determining the dimensions of clean water pipes. The calculation results the population in the Cibinong Tower C apartment building is 957 people with a total need for clean water of 87.95 m3/ day. In meeting the daily needs of clean water in the planning building, a ground water tank with a capacity of 120 m3 is used and a roof tank is used to fulfill water needs at certain hours with a capacity of 49 m3. To distribute water from GWT to RT using a pump with a power capacity of 33.44 Kwatt. The diameter of the clean water pipe uses dimensions from 20 mm to 125 mm. For blackwater wastewater using pipes with dimensions of 60 mm–140 mm and for greywater wastewater using pipes with dimensions of 32 mm–114 mm, while for ventpipes using pipe dimensions of 42 mm–114 mmhttps://ojs.serambimekkah.ac.id/jse/article/view/4092apartment, clean water, installation system, planning, plumbing, waste water
spellingShingle Rhezaldy Pradestama Putra
Kancitra Pharmawati
Anindito Nurprabowo
Perencanaan Sistem Instalasi Plambing Air Bersih dan Air Limbah di Apartemen Menara Cibinong Tower C
Jurnal Serambi Engineering
apartment, clean water, installation system, planning, plumbing, waste water
title Perencanaan Sistem Instalasi Plambing Air Bersih dan Air Limbah di Apartemen Menara Cibinong Tower C
title_full Perencanaan Sistem Instalasi Plambing Air Bersih dan Air Limbah di Apartemen Menara Cibinong Tower C
title_fullStr Perencanaan Sistem Instalasi Plambing Air Bersih dan Air Limbah di Apartemen Menara Cibinong Tower C
title_full_unstemmed Perencanaan Sistem Instalasi Plambing Air Bersih dan Air Limbah di Apartemen Menara Cibinong Tower C
title_short Perencanaan Sistem Instalasi Plambing Air Bersih dan Air Limbah di Apartemen Menara Cibinong Tower C
title_sort perencanaan sistem instalasi plambing air bersih dan air limbah di apartemen menara cibinong tower c
topic apartment, clean water, installation system, planning, plumbing, waste water
url https://ojs.serambimekkah.ac.id/jse/article/view/4092
work_keys_str_mv AT rhezaldypradestamaputra perencanaansisteminstalasiplambingairbersihdanairlimbahdiapartemenmenaracibinongtowerc
AT kancitrapharmawati perencanaansisteminstalasiplambingairbersihdanairlimbahdiapartemenmenaracibinongtowerc
AT aninditonurprabowo perencanaansisteminstalasiplambingairbersihdanairlimbahdiapartemenmenaracibinongtowerc