Analysis of operation modes of shunting diesel locomotives when performing shunting work

An overview of modern trends in updating shunting locomotives, which are based on the installation of on-board energy storage devices, multi-diesel propulsion power plants, and power plants operated on hydrogen energy sources, was carried out. The necessity to take into account the operating conditi...

Full description

Bibliographic Details
Main Authors: S. Goolak, I. Kostenko, R. Keršys, I. Riabov, O. Demydov
Format: Article
Language:English
Published: State University of Infrastructure and Technologies 2023-06-01
Series:Збірник наукових праць Державного університету інфраструктури та технологій: серія "Транспортні системи і технології"
Subjects:
Online Access:https://tst.duit.in.ua/index.php/tst/article/view/363
_version_ 1797790161173479424
author S. Goolak
I. Kostenko
R. Keršys
I. Riabov
O. Demydov
author_facet S. Goolak
I. Kostenko
R. Keršys
I. Riabov
O. Demydov
author_sort S. Goolak
collection DOAJ
description An overview of modern trends in updating shunting locomotives, which are based on the installation of on-board energy storage devices, multi-diesel propulsion power plants, and power plants operated on hydrogen energy sources, was carried out. The necessity to take into account the operating conditions of a shunting diesel locomotive when choosing an upgrade option is shown. The operation modes of shunting diesel locomotives during shunting operations at the Козятин-I freight station during three shifts were considered. By analyzing the data of the БІС-Р onboard system and processing the route sheets, the parameters of the operating modes were determined. Calculations of diesel engine power utilization indicators were performed, according to which it was determined that the full use of the installed diesel generator power is 7.5...8.4%, and the maximum diesel power recorded under the studied operating conditions is about 50%. The duration of work with traction loads is 49.5...68.8% of the shift time. The longest - 55...60% of the total duration of work under traction - are modes with a power of 0...50 kW. The duration of work without load is 18.1...36.9% of the duration of the shift. The shunting work performed is related to the formation and disassembly of trains, including the use of a sorting slide, as a result of which the traction power transmission operates with a low efficiency. In order to reduce the consumption of fuel and energy resources when performing shunting work, it is necessary to update the fleet of locomotives for shunting work, the characteristics of which are adapted to the operating modes.
first_indexed 2024-03-13T02:00:49Z
format Article
id doaj.art-efdb09a76dc94e51a75ceaf6cb585e2d
institution Directory Open Access Journal
issn 2617-9040
2617-9059
language English
last_indexed 2024-03-13T02:00:49Z
publishDate 2023-06-01
publisher State University of Infrastructure and Technologies
record_format Article
series Збірник наукових праць Державного університету інфраструктури та технологій: серія "Транспортні системи і технології"
spelling doaj.art-efdb09a76dc94e51a75ceaf6cb585e2d2023-07-02T01:34:07ZengState University of Infrastructure and TechnologiesЗбірник наукових праць Державного університету інфраструктури та технологій: серія "Транспортні системи і технології"2617-90402617-90592023-06-0141Analysis of operation modes of shunting diesel locomotives when performing shunting workS. GoolakI. KostenkoR. KeršysI. RiabovO. DemydovAn overview of modern trends in updating shunting locomotives, which are based on the installation of on-board energy storage devices, multi-diesel propulsion power plants, and power plants operated on hydrogen energy sources, was carried out. The necessity to take into account the operating conditions of a shunting diesel locomotive when choosing an upgrade option is shown. The operation modes of shunting diesel locomotives during shunting operations at the Козятин-I freight station during three shifts were considered. By analyzing the data of the БІС-Р onboard system and processing the route sheets, the parameters of the operating modes were determined. Calculations of diesel engine power utilization indicators were performed, according to which it was determined that the full use of the installed diesel generator power is 7.5...8.4%, and the maximum diesel power recorded under the studied operating conditions is about 50%. The duration of work with traction loads is 49.5...68.8% of the shift time. The longest - 55...60% of the total duration of work under traction - are modes with a power of 0...50 kW. The duration of work without load is 18.1...36.9% of the duration of the shift. The shunting work performed is related to the formation and disassembly of trains, including the use of a sorting slide, as a result of which the traction power transmission operates with a low efficiency. In order to reduce the consumption of fuel and energy resources when performing shunting work, it is necessary to update the fleet of locomotives for shunting work, the characteristics of which are adapted to the operating modes. https://tst.duit.in.ua/index.php/tst/article/view/363hybrid locomotive, modernization, shunting, energy efficiency, energy storage
spellingShingle S. Goolak
I. Kostenko
R. Keršys
I. Riabov
O. Demydov
Analysis of operation modes of shunting diesel locomotives when performing shunting work
Збірник наукових праць Державного університету інфраструктури та технологій: серія "Транспортні системи і технології"
hybrid locomotive, modernization, shunting, energy efficiency, energy storage
title Analysis of operation modes of shunting diesel locomotives when performing shunting work
title_full Analysis of operation modes of shunting diesel locomotives when performing shunting work
title_fullStr Analysis of operation modes of shunting diesel locomotives when performing shunting work
title_full_unstemmed Analysis of operation modes of shunting diesel locomotives when performing shunting work
title_short Analysis of operation modes of shunting diesel locomotives when performing shunting work
title_sort analysis of operation modes of shunting diesel locomotives when performing shunting work
topic hybrid locomotive, modernization, shunting, energy efficiency, energy storage
url https://tst.duit.in.ua/index.php/tst/article/view/363
work_keys_str_mv AT sgoolak analysisofoperationmodesofshuntingdiesellocomotiveswhenperformingshuntingwork
AT ikostenko analysisofoperationmodesofshuntingdiesellocomotiveswhenperformingshuntingwork
AT rkersys analysisofoperationmodesofshuntingdiesellocomotiveswhenperformingshuntingwork
AT iriabov analysisofoperationmodesofshuntingdiesellocomotiveswhenperformingshuntingwork
AT odemydov analysisofoperationmodesofshuntingdiesellocomotiveswhenperformingshuntingwork