A Three-Stage Prediction Method for Track Displacement During Shield Tunneling
Abstract Track displacement is an important factor of track irregularity. Existing researches related with track displacement prediction generally ignore the influence from underground construction engineering such as shield tunneling, resulting in inaccurate estimation of track displacement. To fil...
Main Authors: | Lei Tan, Yuan Cao, Feng Wang, Tao Tang, Xi Wang, Qiang Li |
---|---|
Format: | Article |
Language: | English |
Published: |
SpringerOpen
2023-07-01
|
Series: | Urban Rail Transit |
Subjects: | |
Online Access: | https://doi.org/10.1007/s40864-023-00195-0 |
Similar Items
-
Displacement Monitoring of Subway Tracks and Tunnels According to Adjacent Construction
by: Jung-Youl Choi, et al.
Published: (2024-02-01) -
Dynamic response analysis of the process of the utility shield tunnel under-passing the operating subway tunnel
by: Jing Sun, et al.
Published: (2023-07-01) -
Additional Stress of Soil and Surface Settlement during Tunnel Shield Construction
by: Ying Li, et al.
Published: (2023-05-01) -
Method of Calculating the Compensation for Rectifying the Horizontal Displacement of Existing Tunnels by Grouting
by: Yongjie Qi, et al.
Published: (2020-12-01) -
Shield Attitude Adjustment Induced by Slurry Pressure Balance (SPB) Shield Tunneling Considering the Effects of Overbreak Cutter: A Numerical Simulation by DEM and Engineering Application
by: Xiang Shen, et al.
Published: (2023-03-01)