A strategic approach for bottleneck identification in make-to-order environments: A drum-buffer-rope action research based case study
Purpose: This study is focused on integrating a strategic perspective for bottleneck selection and exploitation according to the DBR methodology. The researchers developed a systematic process of four steps for the implementation of the first two steps of TOC-DBR in Make-to-Order production systems....
Main Authors: | Aitor Lizarralde Aiastui, Unai Apaolaza Perez de Eulate, Miguel Mediavilla Guisasola |
---|---|
Format: | Article |
Language: | English |
Published: |
OmniaScience
2020-02-01
|
Series: | Journal of Industrial Engineering and Management |
Subjects: | |
Online Access: | http://www.jiem.org/index.php/jiem/article/view/2868 |
Similar Items
-
A Markov chain analysis of the effectiveness of drum-buffer-rope material flow management in job shop environment
by: Masoud Rabbani, et al.
Published: (2015-09-01) -
Analysis of production resources improvement strategies in make-to-stock environments managed by the simplified drum-buffer-rope system
by: Humberto Govoni, et al.
Published: (2021-11-01) -
Estimating the Probability Distribution of Construction Project Completion Times Based on Drum-Buffer-Rope Theory
by: Xun Liu, et al.
Published: (2021-08-01) -
Coordinated Planning and Scheduling of Multiple Projects With New Projects Arrival Under Resource Constraint Using Drum Buffer Rope Heuristic
by: Ullah Saif, et al.
Published: (2022-01-01) -
Order Releasing and Scheduling for a Multi-Item MTO Industry: An Efficient Heuristic Based on Drum Buffer Rope
by: Lei Yue, et al.
Published: (2022-02-01)