The Failure of the Largest Project to Dismantle Hydroelectric Dams in Europe? (Sélune River, France, 2009-2017)

The removal of two hydropower dams announced by the French government in November 2009 would have been an unprecedented operation at European scale due to their dimensions (36 and 16 m high). But this project has been strongly criticized at local level by elected officials and users. The Actor Net...

Full description

Bibliographic Details
Main Authors: Marie-Anne Germaine, Laurent Lespez
Format: Article
Language:English
Published: Water Alternatives Association 2017-10-01
Series:Water Alternatives
Subjects:
Online Access:http://www.water-alternatives.org/index.php/alldoc/articles/vol10/v10issue3/376-a10-3-2/file
_version_ 1818484200235335680
author Marie-Anne Germaine
Laurent Lespez
author_facet Marie-Anne Germaine
Laurent Lespez
author_sort Marie-Anne Germaine
collection DOAJ
description The removal of two hydropower dams announced by the French government in November 2009 would have been an unprecedented operation at European scale due to their dimensions (36 and 16 m high). But this project has been strongly criticized at local level by elected officials and users. The Actor Network Theory is used to reconstitute the successive stages of the consultation process, from the first discussions about the future of the dams (2005) to the downgrading of the project (2016), finally leading to a simple draining of the lake and inspection of the dam. The ANT approach and the methodology based on stakeholder interviews and participant observation are fruitful to identify the actors – humans and non-humans like salmon or lakes – and to analyse their position in sociotechnical networks pro or against dam removal. This method aims to reconstruct the whole process of setting up the campaign groups and their trajectory and to understand the shaping of representations and values. It shows the opposite visions developed by the opponents and defenders of the dam concerning salmon and running/standing water. The way the dialogue process was conducted also plays a crucial role. Interrupted and characterized by many uncertainties, it failed in allowing a translation between expertise and local knowledge.
first_indexed 2024-12-10T15:51:58Z
format Article
id doaj.art-f35c853c3c504904bc0f8695f0511deb
institution Directory Open Access Journal
issn 1965-0175
1965-0175
language English
last_indexed 2024-12-10T15:51:58Z
publishDate 2017-10-01
publisher Water Alternatives Association
record_format Article
series Water Alternatives
spelling doaj.art-f35c853c3c504904bc0f8695f0511deb2022-12-22T01:42:47ZengWater Alternatives AssociationWater Alternatives1965-01751965-01752017-10-01103655676The Failure of the Largest Project to Dismantle Hydroelectric Dams in Europe? (Sélune River, France, 2009-2017)Marie-Anne Germaine0Laurent Lespez1Paris Nanterre University, Paris Est Créteil UniversityThe removal of two hydropower dams announced by the French government in November 2009 would have been an unprecedented operation at European scale due to their dimensions (36 and 16 m high). But this project has been strongly criticized at local level by elected officials and users. The Actor Network Theory is used to reconstitute the successive stages of the consultation process, from the first discussions about the future of the dams (2005) to the downgrading of the project (2016), finally leading to a simple draining of the lake and inspection of the dam. The ANT approach and the methodology based on stakeholder interviews and participant observation are fruitful to identify the actors – humans and non-humans like salmon or lakes – and to analyse their position in sociotechnical networks pro or against dam removal. This method aims to reconstruct the whole process of setting up the campaign groups and their trajectory and to understand the shaping of representations and values. It shows the opposite visions developed by the opponents and defenders of the dam concerning salmon and running/standing water. The way the dialogue process was conducted also plays a crucial role. Interrupted and characterized by many uncertainties, it failed in allowing a translation between expertise and local knowledge.http://www.water-alternatives.org/index.php/alldoc/articles/vol10/v10issue3/376-a10-3-2/fileDam removalActor Network Theory (ANT)micro-politicsgovernanceFrance
spellingShingle Marie-Anne Germaine
Laurent Lespez
The Failure of the Largest Project to Dismantle Hydroelectric Dams in Europe? (Sélune River, France, 2009-2017)
Water Alternatives
Dam removal
Actor Network Theory (ANT)
micro-politics
governance
France
title The Failure of the Largest Project to Dismantle Hydroelectric Dams in Europe? (Sélune River, France, 2009-2017)
title_full The Failure of the Largest Project to Dismantle Hydroelectric Dams in Europe? (Sélune River, France, 2009-2017)
title_fullStr The Failure of the Largest Project to Dismantle Hydroelectric Dams in Europe? (Sélune River, France, 2009-2017)
title_full_unstemmed The Failure of the Largest Project to Dismantle Hydroelectric Dams in Europe? (Sélune River, France, 2009-2017)
title_short The Failure of the Largest Project to Dismantle Hydroelectric Dams in Europe? (Sélune River, France, 2009-2017)
title_sort failure of the largest project to dismantle hydroelectric dams in europe selune river france 2009 2017
topic Dam removal
Actor Network Theory (ANT)
micro-politics
governance
France
url http://www.water-alternatives.org/index.php/alldoc/articles/vol10/v10issue3/376-a10-3-2/file
work_keys_str_mv AT marieannegermaine thefailureofthelargestprojecttodismantlehydroelectricdamsineuropeseluneriverfrance20092017
AT laurentlespez thefailureofthelargestprojecttodismantlehydroelectricdamsineuropeseluneriverfrance20092017
AT marieannegermaine failureofthelargestprojecttodismantlehydroelectricdamsineuropeseluneriverfrance20092017
AT laurentlespez failureofthelargestprojecttodismantlehydroelectricdamsineuropeseluneriverfrance20092017