Risk analysis of tender failure in the procurement of construction services

<p>Failed tender often occurs in the process of procuring in government agencies. In BP2JK Central Java, the number of failed tender packages in the last 3 years is quite high, namely 10-35%. This study aims to analyze the risk of failed tender in the BP2JK area. The method used in this study...

Full description

Bibliographic Details
Main Authors: Andreana Janita, Jati Utomo Dwi Hatmoko, Ferry Hermawan
Format: Article
Language:English
Published: Universitas Sultan Ageng Tirtayasa 2023-06-01
Series:Teknika
Subjects:
Online Access:https://jurnal.untirta.ac.id/index.php/ju-tek/article/view/20059
_version_ 1827130650519404544
author Andreana Janita
Jati Utomo Dwi Hatmoko
Ferry Hermawan
author_facet Andreana Janita
Jati Utomo Dwi Hatmoko
Ferry Hermawan
author_sort Andreana Janita
collection DOAJ
description <p>Failed tender often occurs in the process of procuring in government agencies. In BP2JK Central Java, the number of failed tender packages in the last 3 years is quite high, namely 10-35%. This study aims to analyze the risk of failed tender in the BP2JK area. The method used in this study is descriptive quantitative, where the analysis was based on historical procurement data in the last 4 (four) years and also on a questionnaire to 90 respondents consisting of 28 Pokja and 62 PPK in the BP2JK Central Java area. The results of the analysis show that there are 12 identified risks. If sorted from the highest risk level, these include: selection document errors, evaluation process errors, procurement implementation that was not on schedule, no participants passed the evaluation, bids did not meet requirements, procurement process errors, more than 1 (one) document uploaded, overqualified, owner estimate too low, participants did not show evidence, e-procurement system was hacked and price negotiations were not reached. While the method was frequently used as a risk response is reducing the possibility of a risk occurring, and followed by reducing the impact of risk, sharing risk, avoiding risk or accepting risk.</p><div id="urban-overlay" style="left: -10px; top: -10px; width: 0px; height: 0px;"> </div><div id="urban-overlay"> </div>
first_indexed 2024-03-08T16:18:54Z
format Article
id doaj.art-f3a78317658348cd95c3b4fe778a9fd1
institution Directory Open Access Journal
issn 1693-024X
2654-4113
language English
last_indexed 2025-03-20T16:19:34Z
publishDate 2023-06-01
publisher Universitas Sultan Ageng Tirtayasa
record_format Article
series Teknika
spelling doaj.art-f3a78317658348cd95c3b4fe778a9fd12024-08-31T17:42:29ZengUniversitas Sultan Ageng TirtayasaTeknika1693-024X2654-41132023-06-01191546110.36055/tjst.v19i1.2005910230Risk analysis of tender failure in the procurement of construction servicesAndreana Janita0Jati Utomo Dwi Hatmoko1Ferry Hermawan2Diponegoro UniversityUniversitas DiponegoroUniversitas Diponegoro<p>Failed tender often occurs in the process of procuring in government agencies. In BP2JK Central Java, the number of failed tender packages in the last 3 years is quite high, namely 10-35%. This study aims to analyze the risk of failed tender in the BP2JK area. The method used in this study is descriptive quantitative, where the analysis was based on historical procurement data in the last 4 (four) years and also on a questionnaire to 90 respondents consisting of 28 Pokja and 62 PPK in the BP2JK Central Java area. The results of the analysis show that there are 12 identified risks. If sorted from the highest risk level, these include: selection document errors, evaluation process errors, procurement implementation that was not on schedule, no participants passed the evaluation, bids did not meet requirements, procurement process errors, more than 1 (one) document uploaded, overqualified, owner estimate too low, participants did not show evidence, e-procurement system was hacked and price negotiations were not reached. While the method was frequently used as a risk response is reducing the possibility of a risk occurring, and followed by reducing the impact of risk, sharing risk, avoiding risk or accepting risk.</p><div id="urban-overlay" style="left: -10px; top: -10px; width: 0px; height: 0px;"> </div><div id="urban-overlay"> </div>https://jurnal.untirta.ac.id/index.php/ju-tek/article/view/20059failed auction, procurement, risk level risk analysis, risk response
spellingShingle Andreana Janita
Jati Utomo Dwi Hatmoko
Ferry Hermawan
Risk analysis of tender failure in the procurement of construction services
Teknika
failed auction, procurement, risk level risk analysis, risk response
title Risk analysis of tender failure in the procurement of construction services
title_full Risk analysis of tender failure in the procurement of construction services
title_fullStr Risk analysis of tender failure in the procurement of construction services
title_full_unstemmed Risk analysis of tender failure in the procurement of construction services
title_short Risk analysis of tender failure in the procurement of construction services
title_sort risk analysis of tender failure in the procurement of construction services
topic failed auction, procurement, risk level risk analysis, risk response
url https://jurnal.untirta.ac.id/index.php/ju-tek/article/view/20059
work_keys_str_mv AT andreanajanita riskanalysisoftenderfailureintheprocurementofconstructionservices
AT jatiutomodwihatmoko riskanalysisoftenderfailureintheprocurementofconstructionservices
AT ferryhermawan riskanalysisoftenderfailureintheprocurementofconstructionservices