Risk analysis of tender failure in the procurement of construction services
<p>Failed tender often occurs in the process of procuring in government agencies. In BP2JK Central Java, the number of failed tender packages in the last 3 years is quite high, namely 10-35%. This study aims to analyze the risk of failed tender in the BP2JK area. The method used in this study...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Sultan Ageng Tirtayasa
2023-06-01
|
Series: | Teknika |
Subjects: | |
Online Access: | https://jurnal.untirta.ac.id/index.php/ju-tek/article/view/20059 |
_version_ | 1827130650519404544 |
---|---|
author | Andreana Janita Jati Utomo Dwi Hatmoko Ferry Hermawan |
author_facet | Andreana Janita Jati Utomo Dwi Hatmoko Ferry Hermawan |
author_sort | Andreana Janita |
collection | DOAJ |
description | <p>Failed tender often occurs in the process of procuring in government agencies. In BP2JK Central Java, the number of failed tender packages in the last 3 years is quite high, namely 10-35%. This study aims to analyze the risk of failed tender in the BP2JK area. The method used in this study is descriptive quantitative, where the analysis was based on historical procurement data in the last 4 (four) years and also on a questionnaire to 90 respondents consisting of 28 Pokja and 62 PPK in the BP2JK Central Java area. The results of the analysis show that there are 12 identified risks. If sorted from the highest risk level, these include: selection document errors, evaluation process errors, procurement implementation that was not on schedule, no participants passed the evaluation, bids did not meet requirements, procurement process errors, more than 1 (one) document uploaded, overqualified, owner estimate too low, participants did not show evidence, e-procurement system was hacked and price negotiations were not reached. While the method was frequently used as a risk response is reducing the possibility of a risk occurring, and followed by reducing the impact of risk, sharing risk, avoiding risk or accepting risk.</p><div id="urban-overlay" style="left: -10px; top: -10px; width: 0px; height: 0px;"> </div><div id="urban-overlay"> </div> |
first_indexed | 2024-03-08T16:18:54Z |
format | Article |
id | doaj.art-f3a78317658348cd95c3b4fe778a9fd1 |
institution | Directory Open Access Journal |
issn | 1693-024X 2654-4113 |
language | English |
last_indexed | 2025-03-20T16:19:34Z |
publishDate | 2023-06-01 |
publisher | Universitas Sultan Ageng Tirtayasa |
record_format | Article |
series | Teknika |
spelling | doaj.art-f3a78317658348cd95c3b4fe778a9fd12024-08-31T17:42:29ZengUniversitas Sultan Ageng TirtayasaTeknika1693-024X2654-41132023-06-01191546110.36055/tjst.v19i1.2005910230Risk analysis of tender failure in the procurement of construction servicesAndreana Janita0Jati Utomo Dwi Hatmoko1Ferry Hermawan2Diponegoro UniversityUniversitas DiponegoroUniversitas Diponegoro<p>Failed tender often occurs in the process of procuring in government agencies. In BP2JK Central Java, the number of failed tender packages in the last 3 years is quite high, namely 10-35%. This study aims to analyze the risk of failed tender in the BP2JK area. The method used in this study is descriptive quantitative, where the analysis was based on historical procurement data in the last 4 (four) years and also on a questionnaire to 90 respondents consisting of 28 Pokja and 62 PPK in the BP2JK Central Java area. The results of the analysis show that there are 12 identified risks. If sorted from the highest risk level, these include: selection document errors, evaluation process errors, procurement implementation that was not on schedule, no participants passed the evaluation, bids did not meet requirements, procurement process errors, more than 1 (one) document uploaded, overqualified, owner estimate too low, participants did not show evidence, e-procurement system was hacked and price negotiations were not reached. While the method was frequently used as a risk response is reducing the possibility of a risk occurring, and followed by reducing the impact of risk, sharing risk, avoiding risk or accepting risk.</p><div id="urban-overlay" style="left: -10px; top: -10px; width: 0px; height: 0px;"> </div><div id="urban-overlay"> </div>https://jurnal.untirta.ac.id/index.php/ju-tek/article/view/20059failed auction, procurement, risk level risk analysis, risk response |
spellingShingle | Andreana Janita Jati Utomo Dwi Hatmoko Ferry Hermawan Risk analysis of tender failure in the procurement of construction services Teknika failed auction, procurement, risk level risk analysis, risk response |
title | Risk analysis of tender failure in the procurement of construction services |
title_full | Risk analysis of tender failure in the procurement of construction services |
title_fullStr | Risk analysis of tender failure in the procurement of construction services |
title_full_unstemmed | Risk analysis of tender failure in the procurement of construction services |
title_short | Risk analysis of tender failure in the procurement of construction services |
title_sort | risk analysis of tender failure in the procurement of construction services |
topic | failed auction, procurement, risk level risk analysis, risk response |
url | https://jurnal.untirta.ac.id/index.php/ju-tek/article/view/20059 |
work_keys_str_mv | AT andreanajanita riskanalysisoftenderfailureintheprocurementofconstructionservices AT jatiutomodwihatmoko riskanalysisoftenderfailureintheprocurementofconstructionservices AT ferryhermawan riskanalysisoftenderfailureintheprocurementofconstructionservices |