Tunnel boring machine cutterhead crack propagation life prediction with time integration method
Fatigue damage is one of the most common failure modes of large-scale engineering equipment, especially the full-face tunnel boring machine with characteristics of a thick plate structure bearing strong impact load. It is difficult to predict the location and propagation life of crack of cutterhead...
Main Authors: | Jianbin Li, Zhange Zhang, Zhichao Meng, Junzhou Huo, Zhaohui Xu, Jing Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
SAGE Publishing
2019-06-01
|
Series: | Advances in Mechanical Engineering |
Online Access: | https://doi.org/10.1177/1687814019853451 |
Similar Items
-
A New System to Evaluate Comprehensive Performance of Hard-Rock Tunnel Boring Machine Cutterheads
by: Ye Zhu, et al.
Published: (2019-12-01) -
A Closer Look at the Design of Cutterheads for Hard Rock Tunnel-Boring Machines
by: Jamal Rostami, et al.
Published: (2017-12-01) -
A Time-Integral Crack Propagation Model Considering Thickness Effect
by: Junzhou Huo, et al.
Published: (2019-01-01) -
Research on Dynamic Models and Performances of Shield Tunnel Boring Machine Cutterhead Driving System
by: Xianhong Li, et al.
Published: (2013-01-01) -
A Novel Hybrid Transfer Learning Framework for Dynamic Cutterhead Torque Prediction of the Tunnel Boring Machine
by: Tao Fu, et al.
Published: (2022-04-01)