Multiyear Non-Deterministic Power System Expansion Planning Considering Wind âFarms Using a Hybrid Combination of Stochastic âProgramming and Minimax Regret Criterion
This paper presents a novel formulation for multilayer composite generation and transmission expansion planning considering the high penetration of wind farms. The proposed approach employs the so-called two-stage stochastic programming to cope with the uncertain nature of load demand and wind power...
Main Authors: | , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Semnan University
2017-01-01
|
Series: | مجله مدل سازی در مهندسی |
Subjects: | |
Online Access: | https://modelling.semnan.ac.ir/article_2420_4fd8d6f8e8102b3b782de80c49427676.pdf |
_version_ | 1797296641368129536 |
---|---|
author | Shahab Dehghan Nima Amjady |
author_facet | Shahab Dehghan Nima Amjady |
author_sort | Shahab Dehghan |
collection | DOAJ |
description | This paper presents a novel formulation for multilayer composite generation and transmission expansion planning considering the high penetration of wind farms. The proposed approach employs the so-called two-stage stochastic programming to cope with the uncertain nature of load demand and wind power and then find the optimal expansion plan among candidate generating units and transmission lines through the minimax regret criterion. Finally, the proposed approach is implemented on 24-bus reliability test system and the effect of the number of scenarios on the computational burden as well as the final optimal solution is evaluated. |
first_indexed | 2024-03-07T22:07:42Z |
format | Article |
id | doaj.art-f416daf02214456387765a385da3ca30 |
institution | Directory Open Access Journal |
issn | 2008-4854 2783-2538 |
language | fas |
last_indexed | 2024-03-07T22:07:42Z |
publishDate | 2017-01-01 |
publisher | Semnan University |
record_format | Article |
series | مجله مدل سازی در مهندسی |
spelling | doaj.art-f416daf02214456387765a385da3ca302024-02-23T19:01:54ZfasSemnan Universityمجله مدل سازی در مهندسی2008-48542783-25382017-01-011447415010.22075/jme.2017.24202420Multiyear Non-Deterministic Power System Expansion Planning Considering Wind âFarms Using a Hybrid Combination of Stochastic âProgramming and Minimax Regret CriterionShahab Dehghan0Nima Amjady1دانشگاه آزاد قزویندانشگاه سمنانThis paper presents a novel formulation for multilayer composite generation and transmission expansion planning considering the high penetration of wind farms. The proposed approach employs the so-called two-stage stochastic programming to cope with the uncertain nature of load demand and wind power and then find the optimal expansion plan among candidate generating units and transmission lines through the minimax regret criterion. Finally, the proposed approach is implemented on 24-bus reliability test system and the effect of the number of scenarios on the computational burden as well as the final optimal solution is evaluated.https://modelling.semnan.ac.ir/article_2420_4fd8d6f8e8102b3b782de80c49427676.pdfgeneration expansion planningminimax regretstochastic programmingtransmission expnasion planninguncertaintywind farm |
spellingShingle | Shahab Dehghan Nima Amjady Multiyear Non-Deterministic Power System Expansion Planning Considering Wind âFarms Using a Hybrid Combination of Stochastic âProgramming and Minimax Regret Criterion مجله مدل سازی در مهندسی generation expansion planning minimax regret stochastic programming transmission expnasion planning uncertainty wind farm |
title | Multiyear Non-Deterministic Power System Expansion Planning Considering Wind âFarms Using a Hybrid Combination of Stochastic âProgramming and Minimax Regret Criterion |
title_full | Multiyear Non-Deterministic Power System Expansion Planning Considering Wind âFarms Using a Hybrid Combination of Stochastic âProgramming and Minimax Regret Criterion |
title_fullStr | Multiyear Non-Deterministic Power System Expansion Planning Considering Wind âFarms Using a Hybrid Combination of Stochastic âProgramming and Minimax Regret Criterion |
title_full_unstemmed | Multiyear Non-Deterministic Power System Expansion Planning Considering Wind âFarms Using a Hybrid Combination of Stochastic âProgramming and Minimax Regret Criterion |
title_short | Multiyear Non-Deterministic Power System Expansion Planning Considering Wind âFarms Using a Hybrid Combination of Stochastic âProgramming and Minimax Regret Criterion |
title_sort | multiyear non deterministic power system expansion planning considering wind afarms using a hybrid combination of stochastic aprogramming and minimax regret criterion |
topic | generation expansion planning minimax regret stochastic programming transmission expnasion planning uncertainty wind farm |
url | https://modelling.semnan.ac.ir/article_2420_4fd8d6f8e8102b3b782de80c49427676.pdf |
work_keys_str_mv | AT shahabdehghan multiyearnondeterministicpowersystemexpansionplanningconsideringwindafarmsusingahybridcombinationofstochasticaprogrammingandminimaxregretcriterion AT nimaamjady multiyearnondeterministicpowersystemexpansionplanningconsideringwindafarmsusingahybridcombinationofstochasticaprogrammingandminimaxregretcriterion |