Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project

To realize demand-oriented operations in the middle route of South-to-North Water Diversion Project, this paper proposed a pool operation method that a variation interval of water level at the upstream of the check gate is allowed. In this method, water users’ demand for flow changes can be satisfie...

Full description

Bibliographic Details
Main Authors: Wu Yongyan, Huang Huiyong, Li Qi, Yan Yibo
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201824601039
_version_ 1819179012801429504
author Wu Yongyan
Huang Huiyong
Li Qi
Yan Yibo
author_facet Wu Yongyan
Huang Huiyong
Li Qi
Yan Yibo
author_sort Wu Yongyan
collection DOAJ
description To realize demand-oriented operations in the middle route of South-to-North Water Diversion Project, this paper proposed a pool operation method that a variation interval of water level at the upstream of the check gate is allowed. In this method, water users’ demand for flow changes can be satisfied as much as possible. Accordingly, downstream water depth is kept to fluctuate within a certain range, which is determined considering the canal safety, the operation frequency of check gates and the pool delay. The method is tested using the self-developed simulation platform for the middle route of South-to-North Water Diversion Project, which is established based on the Saint-Venant equations and programmed with the language Fortran. Results show that the flow changes demanded by water users, either increase or decrease, can be achieved effectively, while the water level variations can meet the restrictions for canal operation safety, and the frequency of gate adjustment is practically acceptable as well. Therefore, the operation method of allowing variation interval of downstream water level is suitable in the middle route of South-to-North Water Diversion Project at the current stage.
first_indexed 2024-12-22T21:51:41Z
format Article
id doaj.art-f5a645753f004f70988332dbbaadc448
institution Directory Open Access Journal
issn 2261-236X
language English
last_indexed 2024-12-22T21:51:41Z
publishDate 2018-01-01
publisher EDP Sciences
record_format Article
series MATEC Web of Conferences
spelling doaj.art-f5a645753f004f70988332dbbaadc4482022-12-21T18:11:21ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012460103910.1051/matecconf/201824601039matecconf_iswso2018_01039Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion ProjectWu Yongyan0Huang Huiyong1Li Qi2Yan Yibo3Changjiang Institute of Survey, Planning, Design and Research, Planning departmentChangjiang Institute of Survey, Planning, Design and Research, Planning departmentChangjiang Institute of Survey, Planning, Design and Research, Planning departmentChangjiang Institute of Survey, Planning, Design and Research, Planning departmentTo realize demand-oriented operations in the middle route of South-to-North Water Diversion Project, this paper proposed a pool operation method that a variation interval of water level at the upstream of the check gate is allowed. In this method, water users’ demand for flow changes can be satisfied as much as possible. Accordingly, downstream water depth is kept to fluctuate within a certain range, which is determined considering the canal safety, the operation frequency of check gates and the pool delay. The method is tested using the self-developed simulation platform for the middle route of South-to-North Water Diversion Project, which is established based on the Saint-Venant equations and programmed with the language Fortran. Results show that the flow changes demanded by water users, either increase or decrease, can be achieved effectively, while the water level variations can meet the restrictions for canal operation safety, and the frequency of gate adjustment is practically acceptable as well. Therefore, the operation method of allowing variation interval of downstream water level is suitable in the middle route of South-to-North Water Diversion Project at the current stage.https://doi.org/10.1051/matecconf/201824601039
spellingShingle Wu Yongyan
Huang Huiyong
Li Qi
Yan Yibo
Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project
MATEC Web of Conferences
title Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project
title_full Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project
title_fullStr Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project
title_full_unstemmed Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project
title_short Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project
title_sort operation method of allowing variation interval of downstream water level in the middle route of south to north water diversion project
url https://doi.org/10.1051/matecconf/201824601039
work_keys_str_mv AT wuyongyan operationmethodofallowingvariationintervalofdownstreamwaterlevelinthemiddlerouteofsouthtonorthwaterdiversionproject
AT huanghuiyong operationmethodofallowingvariationintervalofdownstreamwaterlevelinthemiddlerouteofsouthtonorthwaterdiversionproject
AT liqi operationmethodofallowingvariationintervalofdownstreamwaterlevelinthemiddlerouteofsouthtonorthwaterdiversionproject
AT yanyibo operationmethodofallowingvariationintervalofdownstreamwaterlevelinthemiddlerouteofsouthtonorthwaterdiversionproject