Flood Inundation Prediction of Logung River due to the Break of Logung Dam
The construction of Logung Dam in Kudus Regency is aimed to reduce the inundation area at downstream of Logung River, particularly during the rainy season. Besides, the potential water of Logung Dam is used for for irrigation and non-irrigation services. In order to mitigate the flood disaster that...
Main Author: | Listyo Rini Ekaningtyas |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Gadjah Mada
2017-09-01
|
Series: | Journal of the Civil Engineering Forum |
Subjects: | |
Online Access: | https://jurnal.ugm.ac.id/jcef/article/view/28109 |
Similar Items
-
OpenLISEM Flash Flood Modelling Application in Logung Sub-Catchment, Central Java
by: Fitrie Atviana Nurritasari, et al.
Published: (2016-02-01) -
Optimasi Lepasan Waduk Logung dengan Algoritma Genetik
by: Widyayuni Nur Harjanti, et al.
Published: (2020-03-01) -
Assessment of water quality and pollution load in Logung reservoir, Indonesia
by: Ihrami Rahmila Yulizar, et al.
Published: (2024-01-01) -
Warning Time Analysis of Nasiri River Flash Flood due to Several Possible Natural Dam Break Events
by: Andry Putra Styawan, et al.
Published: (2018-01-01) -
Dependable Flow and Flood Control Performance of Logung Dam, Central Java Province, Indonesia
by: Faza Ramadhani
Published: (2017-09-01)