OUT OF REACTOR TESTING TECHNOLOGIES OF F/M HEADS – ROMANIAN EXPERIENCE FUNCTIONAL TESTING OF TELESCOPIC CYLINDER RAM ASSEMBLY
Testing of F/M Heads (loaded/unloaded car) before installing them in the CANDU reactor is a task of utmost importance in the process of commissioning the nuclear power plant. Maximum capacity reactor operation in safe conditions depends on successfully testing of the F/M Heads. Completion of F/M Hea...
Principais autores: | , |
---|---|
Formato: | Artigo |
Idioma: | English |
Publicado em: |
Editura Academiei Oamenilor de Știință din România
2014-05-01
|
coleção: | Annals: Series on engineering sciences (Academy of Romanian Scientists) |
Assuntos: | |
Acesso em linha: | http://aos.ro/wp-content/anale/TVol6Nr1Art.6.pdf |
Resumo: | Testing of F/M Heads (loaded/unloaded car) before installing them in the CANDU reactor is a task of utmost importance in the process of commissioning the nuclear power plant. Maximum capacity reactor operation in safe conditions depends on successfully testing of the F/M Heads. Completion of F/M Heads Testing for Cernavoda Unit 2, certifies both the proper functioning of the machinery as well as the ability of the staff and existing technology from INR Piteşti to achieve complex activities for nuclear power plant, F/M Heads testing being a national and European premiere. |
---|---|
ISSN: | 2066-6950 2066-8570 |