A study on the factors causing bottleneck problems in the manufacturing industry using principal component analysis

There are a myriad of bottleneck variables that constrict the overall manufacturing capacity and make improvement decisions complex. Consequently, this study aims to identify and analyse the copious variables to pinpoint the key variable factors that influence and turn the manufacturing elements int...

Full description

Bibliographic Details
Main Authors: S.O. Ongbali, S.A. Afolalu, S.A. Oyedepo, A.K. Aworinde, M.A. Fajobi
Format: Article
Language:English
Published: Elsevier 2021-05-01
Series:Heliyon
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2405844021011233
_version_ 1824021514586947584
author S.O. Ongbali
S.A. Afolalu
S.A. Oyedepo
A.K. Aworinde
M.A. Fajobi
author_facet S.O. Ongbali
S.A. Afolalu
S.A. Oyedepo
A.K. Aworinde
M.A. Fajobi
author_sort S.O. Ongbali
collection DOAJ
description There are a myriad of bottleneck variables that constrict the overall manufacturing capacity and make improvement decisions complex. Consequently, this study aims to identify and analyse the copious variables to pinpoint the key variable factors that influence and turn the manufacturing elements into bottleneck problem to prioritize process improvement effort. The study is limited to identifying and analysing the numerous bottleneck variables to gain insight into how much each of the variables influences the process output via the manufacturing elements. The 76-bottleneck variables abstracted from the literature were used to craft a structured questionnaire that were administered to respondents in the manufacturing industry whose size was determined at a 95% confidence level and 5% error margin respectively. The 95% confidence level is chosen to ensure adequate representation of the population and to validate the data for the study. The respondents' scores were collated into (m x n) data matrix which served as input variable into the factor analysis model. StatistiXL software was then employed to evaluate the data matrix. The trivial variables were discarded and 19 factors with eigenvalues (λ ˃ 1) were extracted and creatively labelled for interpretation. The result established that the “Process capability index” is the principal bottleneck factor that loaded 25% of the variables studied. The principal variables in the cluster include Equipment failure = -0.832, Operations = -0.780, Material unavailability = -0.811, and Market demand = -0.739 among others. Similarly, Manufacturing process restraint, Resources, Weather, Communication, Logistics, and Line dedication are other key factors by the magnitude of their respective variables’ factor loadings such as Random event = 0.812, Raw materials flow = -0.834, Process technology = 0.878, and Random environmental factors among other variables. Although bottleneck problems vary from one manufacturing system to another, the problems identified and the solutions presented in this study are generic and the improvement effort should focus on addressing the principal variables while not neglecting the middling and weakling variables.
first_indexed 2024-12-19T01:47:08Z
format Article
id doaj.art-f72689b432ee4946b0ee442f48b126a6
institution Directory Open Access Journal
issn 2405-8440
language English
last_indexed 2024-12-19T01:47:08Z
publishDate 2021-05-01
publisher Elsevier
record_format Article
series Heliyon
spelling doaj.art-f72689b432ee4946b0ee442f48b126a62022-12-21T20:41:35ZengElsevierHeliyon2405-84402021-05-0175e07020A study on the factors causing bottleneck problems in the manufacturing industry using principal component analysisS.O. Ongbali0S.A. Afolalu1S.A. Oyedepo2A.K. Aworinde3M.A. Fajobi4Corresponding author.; Department Mechanical Engineering, Covenant University, Ota, Ogun State, NigeriaDepartment Mechanical Engineering, Covenant University, Ota, Ogun State, NigeriaDepartment Mechanical Engineering, Covenant University, Ota, Ogun State, NigeriaDepartment Mechanical Engineering, Covenant University, Ota, Ogun State, NigeriaDepartment Mechanical Engineering, Covenant University, Ota, Ogun State, NigeriaThere are a myriad of bottleneck variables that constrict the overall manufacturing capacity and make improvement decisions complex. Consequently, this study aims to identify and analyse the copious variables to pinpoint the key variable factors that influence and turn the manufacturing elements into bottleneck problem to prioritize process improvement effort. The study is limited to identifying and analysing the numerous bottleneck variables to gain insight into how much each of the variables influences the process output via the manufacturing elements. The 76-bottleneck variables abstracted from the literature were used to craft a structured questionnaire that were administered to respondents in the manufacturing industry whose size was determined at a 95% confidence level and 5% error margin respectively. The 95% confidence level is chosen to ensure adequate representation of the population and to validate the data for the study. The respondents' scores were collated into (m x n) data matrix which served as input variable into the factor analysis model. StatistiXL software was then employed to evaluate the data matrix. The trivial variables were discarded and 19 factors with eigenvalues (λ ˃ 1) were extracted and creatively labelled for interpretation. The result established that the “Process capability index” is the principal bottleneck factor that loaded 25% of the variables studied. The principal variables in the cluster include Equipment failure = -0.832, Operations = -0.780, Material unavailability = -0.811, and Market demand = -0.739 among others. Similarly, Manufacturing process restraint, Resources, Weather, Communication, Logistics, and Line dedication are other key factors by the magnitude of their respective variables’ factor loadings such as Random event = 0.812, Raw materials flow = -0.834, Process technology = 0.878, and Random environmental factors among other variables. Although bottleneck problems vary from one manufacturing system to another, the problems identified and the solutions presented in this study are generic and the improvement effort should focus on addressing the principal variables while not neglecting the middling and weakling variables.http://www.sciencedirect.com/science/article/pii/S2405844021011233Bottleneck problemVariableFactorsAnalysisManufacturing systemIndustry
spellingShingle S.O. Ongbali
S.A. Afolalu
S.A. Oyedepo
A.K. Aworinde
M.A. Fajobi
A study on the factors causing bottleneck problems in the manufacturing industry using principal component analysis
Heliyon
Bottleneck problem
Variable
Factors
Analysis
Manufacturing system
Industry
title A study on the factors causing bottleneck problems in the manufacturing industry using principal component analysis
title_full A study on the factors causing bottleneck problems in the manufacturing industry using principal component analysis
title_fullStr A study on the factors causing bottleneck problems in the manufacturing industry using principal component analysis
title_full_unstemmed A study on the factors causing bottleneck problems in the manufacturing industry using principal component analysis
title_short A study on the factors causing bottleneck problems in the manufacturing industry using principal component analysis
title_sort study on the factors causing bottleneck problems in the manufacturing industry using principal component analysis
topic Bottleneck problem
Variable
Factors
Analysis
Manufacturing system
Industry
url http://www.sciencedirect.com/science/article/pii/S2405844021011233
work_keys_str_mv AT soongbali astudyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT saafolalu astudyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT saoyedepo astudyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT akaworinde astudyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT mafajobi astudyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT soongbali studyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT saafolalu studyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT saoyedepo studyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT akaworinde studyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis
AT mafajobi studyonthefactorscausingbottleneckproblemsinthemanufacturingindustryusingprincipalcomponentanalysis