Estimation of Flood Travel Time in River Network of the Middle Yellow River, China
The flood travel time (FTT) along the Longmen-Tongguan Reach, part of the stem channel of the Middle Yellow River, is shorter than 30 h, and estimating the FTT of different discharges propagating from Wubu Hydrology Station to Tongguan Hydrology Station is necessary. However, the propagation of floo...
Main Author: | Li He |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-05-01
|
Series: | Water |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-4441/12/6/1550 |
Similar Items
-
Synoptic Analysis of Flood-Causing Rainfall and Flood Characteristics in the Source Area of the Yellow River
by: Lijun Jin, et al.
Published: (2024-03-01) -
Natural calamity and cultural formation: A study on Yellow River flooding region
by: Ruobing Liang
Published: (2022-03-01) -
The Yellow Emperor Culture and the Yellow River Culture
by: Xu Guangchun
Published: (2016-01-01) -
Effect of Cascade Reservoirs on Flood Routing in the Hongshui River, Southern China
by: Zhang Kang, et al.
Published: (2015-01-01) -
Impacts of Riverine Floods on Morphodynamics in the Yellow River Delta
by: Yutao Fu, et al.
Published: (2023-04-01)