An Optimal Maintenance and Replacement Strategy for Deteriorating Water Mains
Municipal water mains are built with a target service age of several decades. In such a long life, breaks can occur, even multiple times. Water mains can be maintained before or right at breaks. The former is referred to as the preventive strategy, whereas the latter is the corrective strategy. Depe...
Main Authors: | Peiyuan Lin, Xianying Chen, Sheng Huang, Baosong Ma |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-06-01
|
Series: | Water |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-4441/14/13/2097 |
Similar Items
-
Availability analysis of a consecutive three stages deteriorating standby system considering maintenance and replacement
by: Ramatu İdris Gatawa, et al.
Published: (2018-05-01) -
JIT Production Strategy and Maintenance for Quality Deteriorating Systems
by: Héctor Rivera-Gómez, et al.
Published: (2019-03-01) -
A Comparative Study of Preventive Maintenance Thresholds for Deteriorating Systems
by: Marugan Alberto Pliego, et al.
Published: (2023-01-01) -
A maintenance activity scheduling with time-and-position dependent deteriorating effects
by: Weiguo Liu, et al.
Published: (2022-08-01) -
A robust evaluating strategy of tunnel deterioration using ensemble machine learning algorithms
by: Du, Liang, et al.
Published: (2024)