Safety inspection on level crossing JPL 727 km 537+453 Patak-Pathukan Road, Sleman, Yogyakarta

Level crossing (LC) safety inspection between a highway and a railroad on Pirak-Pathukan Road, Sleman, Yogyakarta is necessary because this LC is located near various community centers, has high traffic volume, intersects with railway double tracks, and intersecting angle that is not perpendicular....

Full description

Bibliographic Details
Main Authors: Dian Setiawan M, Sari Mayang, Mahmudah Noor
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201818104005
_version_ 1818615958260940800
author Dian Setiawan M
Sari Mayang
Mahmudah Noor
author_facet Dian Setiawan M
Sari Mayang
Mahmudah Noor
author_sort Dian Setiawan M
collection DOAJ
description Level crossing (LC) safety inspection between a highway and a railroad on Pirak-Pathukan Road, Sleman, Yogyakarta is necessary because this LC is located near various community centers, has high traffic volume, intersects with railway double tracks, and intersecting angle that is not perpendicular. This study aims to evaluate LC technical condition, analyse delay time and vehicles queue length, and evaluate pavement structure condition. The research results indicate: 1) LC technical conditions do not meet the requirements of Regulation of Director General of Land Transport No. 770 Year 2005; 2) The longest duration of LC gate closure occurred on Sunday at 15:05, that is 360 seconds, the highest traffic flow occurred on Monday (from the South side) that is equal to 1443 skr/day, and the longest delay time occurs on Sunday at 15:05, that is 498 seconds; 3) The value of pavement condition index (PCI) is 82% very good.
first_indexed 2024-12-16T16:42:10Z
format Article
id doaj.art-f9b4c7b364014832a0f5da7eea1798f6
institution Directory Open Access Journal
issn 2261-236X
language English
last_indexed 2024-12-16T16:42:10Z
publishDate 2018-01-01
publisher EDP Sciences
record_format Article
series MATEC Web of Conferences
spelling doaj.art-f9b4c7b364014832a0f5da7eea1798f62022-12-21T22:24:16ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011810400510.1051/matecconf/201818104005matecconf_istsdc2017_04005Safety inspection on level crossing JPL 727 km 537+453 Patak-Pathukan Road, Sleman, YogyakartaDian Setiawan MSari MayangMahmudah NoorLevel crossing (LC) safety inspection between a highway and a railroad on Pirak-Pathukan Road, Sleman, Yogyakarta is necessary because this LC is located near various community centers, has high traffic volume, intersects with railway double tracks, and intersecting angle that is not perpendicular. This study aims to evaluate LC technical condition, analyse delay time and vehicles queue length, and evaluate pavement structure condition. The research results indicate: 1) LC technical conditions do not meet the requirements of Regulation of Director General of Land Transport No. 770 Year 2005; 2) The longest duration of LC gate closure occurred on Sunday at 15:05, that is 360 seconds, the highest traffic flow occurred on Monday (from the South side) that is equal to 1443 skr/day, and the longest delay time occurs on Sunday at 15:05, that is 498 seconds; 3) The value of pavement condition index (PCI) is 82% very good.https://doi.org/10.1051/matecconf/201818104005
spellingShingle Dian Setiawan M
Sari Mayang
Mahmudah Noor
Safety inspection on level crossing JPL 727 km 537+453 Patak-Pathukan Road, Sleman, Yogyakarta
MATEC Web of Conferences
title Safety inspection on level crossing JPL 727 km 537+453 Patak-Pathukan Road, Sleman, Yogyakarta
title_full Safety inspection on level crossing JPL 727 km 537+453 Patak-Pathukan Road, Sleman, Yogyakarta
title_fullStr Safety inspection on level crossing JPL 727 km 537+453 Patak-Pathukan Road, Sleman, Yogyakarta
title_full_unstemmed Safety inspection on level crossing JPL 727 km 537+453 Patak-Pathukan Road, Sleman, Yogyakarta
title_short Safety inspection on level crossing JPL 727 km 537+453 Patak-Pathukan Road, Sleman, Yogyakarta
title_sort safety inspection on level crossing jpl 727 km 537 453 patak pathukan road sleman yogyakarta
url https://doi.org/10.1051/matecconf/201818104005
work_keys_str_mv AT diansetiawanm safetyinspectiononlevelcrossingjpl727km537453patakpathukanroadslemanyogyakarta
AT sarimayang safetyinspectiononlevelcrossingjpl727km537453patakpathukanroadslemanyogyakarta
AT mahmudahnoor safetyinspectiononlevelcrossingjpl727km537453patakpathukanroadslemanyogyakarta