On the transition of the prefabrication system of buildings constructed at Syowa Station by JARE
The total floor area of buildings at Syowa Station in Antarctica is 4400m^2 and about 80% of these buildings is prefabricated. This paper aims at reviewing the significance and the transition of prefabrication of buildings since the establishment of the station in 1957 with reference to the problems...
Main Authors: | Toshio Sato, Zenkichi Hirayama |
---|---|
Format: | Article |
Language: | English |
Published: |
National Institute of Polar Research
1985-03-01
|
Series: | Antarctic Record |
Online Access: | http://doi.org/10.15094/00008440 |
Similar Items
-
Construction of the new central building of Syowa Station, Antarctica (2) Production and transportation of building elements and building work at Syowa Station
by: Toshio Hannuki, et al.
Published: (1993-11-01) -
Construction of the new central building of Syowa Station, Antarctica (1)Preliminary design of the building
by: Toshio Hannuki, et al.
Published: (1993-03-01) -
The Present Condition of the Building at Syowa Station
by: Zenkichi HIRAYAMA
Published: (1961-01-01) -
Mechanical properties of gypsum as the structural material with the advance of inflammability of building at Syowa Station
by: Toshio Sato, et al.
Published: (1982-02-01) -
Displacement Method in the Shear Field Theory of the Reinforced Panels and Experiments on Panels Used in the Buildings at Syowa Station
by: Toshio SATO, et al.
Published: (1967-03-01)