Static and Dynamic Analyses of Micropiles to Reinforce the High Railway Embankments on Loose Beds

Construction of railway embankments on loose beds without using any methods of soil improvement (e.g. stone columns in silt and clay beds, deep soil mixing method, jet grouting and also using micropiles individually or in groups form) leads to  reduction of embankment slope gradient, which significa...

Full description

Bibliographic Details
Main Authors: M. Esmaeili, M. Gharouni Nik, F. Khayyer
Format: Article
Language:English
Published: Semnan University 2013-08-01
Series:Journal of Rehabilitation in Civil Engineering
Subjects:
Online Access:https://civiljournal.semnan.ac.ir/article_11_8df230c5ff21484f8447231862edc63a.pdf
Description
Summary:Construction of railway embankments on loose beds without using any methods of soil improvement (e.g. stone columns in silt and clay beds, deep soil mixing method, jet grouting and also using micropiles individually or in groups form) leads to  reduction of embankment slope gradient, which significantly increases the volume of soil operation. Generally, micropile as a reinforcing element with the main characteristics of improving the mechanical-physical properties of soil, is a proper methodology for the aim of improving loose earth with low bearing capacity and intensive settlement characteristics. This paper explores numerical models of non-reinforced and reinforced railway embankments (with the height of 10 to 25 m) rested on loose beds that simulated and analyzed by SLIDE software. It should be considered that in order to reinforce the embankments using different arrangements of micropiles. In addition, the non-reinforced and reinforced embankments were analyzed against different load combinations that consist of railway operational load, permanent weight of the rail line and intense earthquake load. It should be mentioned that LM71 standard load was used as operational load during the simulations. The main purpose of this paper is finding the optimum arrangement of micropiles to reinforce the high railway embankments on loose beds. Therefore, according numerical analyses procedure, it was resulted that the use of micropiles exactly between toe and 1/3 to 1/2 length of the embankment slope is the optimal way to reinforce the embankments on loose beds.