Flow diagrams of overburden dumping in borrow excavation of the adjacent area
The relevance of the discussed issue is caused by group location of open pit mining and by restriction of areas for outside dumping. The development of open mining of coal deposits in areas with a group location is facilitated by relatively low investments, rapid commissioning, low cost of 1 ton of...
Main Author: | Evgeny Vladimirovich Kurekhin |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Tomsk Polytechnic University
2017-08-01
|
Series: | Известия Томского политехнического университета: Инжиниринг георесурсов |
Subjects: | |
Online Access: | http://izvestiya-tpu.ru/archive/article/view/1883 |
Similar Items
-
Flow diagrams of overburden dumping in borrow excavation of the adjacent area
by: Evgeny Vladimirovich Kurekhin
Published: (2017-08-01) -
Application the software solution for calculation the capacity of bucket wheel excavators in the complex conditions from the aspect of resistance to excavation
by: Stanić Nikola, et al.
Published: (2017-01-01) -
Optimizing Digging Equipment Productivity Using Overall Equipment Effectiveness (OEE) Method in Coal Overburden Mining Activities
by: Heri Prabowo, et al.
Published: (2023-12-01) -
Evaluation of numerical simulation of the process of adapting internal dumping mode to the existing mining fields of the Kemerovo region
by: Alexey Vladimirovich Selyukov
Published: (2019-05-01) -
Evaluation of numerical simulation of the process of adapting internal dumping mode to the existing mining fields of the Kemerovo region
by: Alexey Vladimirovich Selyukov
Published: (2019-05-01)