Technology and determination of the applicability of stone blowing at the current track maintenance

Grain composition of track ballast is in a narrow size range, which provides maximum volume of ballast voids of 30–60 mm for category 1 crushed stone, 25–60 mm for category 2 crushed stone with round sieves and 22.4–63.0 mm for category B crushed stone with square sieves. This range facilitates drai...

Full description

Bibliographic Details
Main Authors: V. N. Kaplin, A. A. Abrashitov, E. N. Grin’
Format: Article
Language:Russian
Published: Joint Stock Company «Railway Scientific and Research Institute» 2020-05-01
Series:Вестник Научно-исследовательского института железнодорожного транспорта
Subjects:
Online Access:https://www.journal-vniizht.ru/jour/article/view/399
_version_ 1797872319871320064
author V. N. Kaplin
A. A. Abrashitov
E. N. Grin’
author_facet V. N. Kaplin
A. A. Abrashitov
E. N. Grin’
author_sort V. N. Kaplin
collection DOAJ
description Grain composition of track ballast is in a narrow size range, which provides maximum volume of ballast voids of 30–60 mm for category 1 crushed stone, 25–60 mm for category 2 crushed stone with round sieves and 22.4–63.0 mm for category B crushed stone with square sieves. This range facilitates drainage and provides significant intra-ballast cavities for storing products of spalling and abrasion of particles of ballast material. All of these useful ballast functions are provided when the ballast is properly packed. The wider size range of ballast particles provides, in turn, increased strength and deformation resistance due to a denser arrangement of particles, but in this case the ballast has a smaller volume of voids. In the event of increased abrasion of the ballast, for example in the form of a shake, accompanied by the formation of fine particles (less than 0.01 mm), a decrease in the volume of the voids of the ballast prism can be critical for the drainage properties of the ballast.The article presents the test results of experimental technology for surfacing of the track ballast — surfacing with stone blowing carried out by specialists of the JSC “VNIIZhT” and the RUT MIIT (“Tracks and track facility” Department) in 2018. In October 2017 comparative tests of surfacing for under-sleeper pads and stone blowing were carried out under the conditions of the Test Ring of the JSC “VNIIZhT” which is close to the actual operating conditions. Then, three sections were laid in the operational area of the Test Ring — two tested (with surfacing for under-sleeper pads and stone blowing) and one reference. The need to continue researching exactly the stone blowing technology arose due to the fact that in October 2017, due to climatic conditions (air temperature fluctuations to negative values), it was not possible to obtain force track profiles and clarify the migration factors of blown crushed stone into track ballast.The test results confirmed the effectiveness of track surfacing with a stone blowing process. The use of new equipment allows improving this surfacing technology. As part of the tests, it was possible to find ways to counteract the migration of blown crushed stone into track ballast.
first_indexed 2024-04-10T00:56:52Z
format Article
id doaj.art-fbd8201f88984baf999a6d6dc8c1d30f
institution Directory Open Access Journal
issn 2223-9731
2713-2560
language Russian
last_indexed 2024-04-10T00:56:52Z
publishDate 2020-05-01
publisher Joint Stock Company «Railway Scientific and Research Institute»
record_format Article
series Вестник Научно-исследовательского института железнодорожного транспорта
spelling doaj.art-fbd8201f88984baf999a6d6dc8c1d30f2023-03-13T10:14:33ZrusJoint Stock Company «Railway Scientific and Research Institute»Вестник Научно-исследовательского института железнодорожного транспорта2223-97312713-25602020-05-01792747910.21780/2223-9731-2020-79-2-74-79279Technology and determination of the applicability of stone blowing at the current track maintenanceV. N. Kaplin0A. A. Abrashitov1E. N. Grin’2Акционерное общество «Научно-исследовательский институт железнодорожного транспорта» (АО «ВНИИЖТ»)Федеральное государственное автономное образовательное учреждение высшего образования «Российский университет транспорта» (ФГАОУ ВО РУТ (МИИТ))Федеральное государственное автономное образовательное учреждение высшего образования «Российский университет транспорта» (ФГАОУ ВО РУТ (МИИТ))Grain composition of track ballast is in a narrow size range, which provides maximum volume of ballast voids of 30–60 mm for category 1 crushed stone, 25–60 mm for category 2 crushed stone with round sieves and 22.4–63.0 mm for category B crushed stone with square sieves. This range facilitates drainage and provides significant intra-ballast cavities for storing products of spalling and abrasion of particles of ballast material. All of these useful ballast functions are provided when the ballast is properly packed. The wider size range of ballast particles provides, in turn, increased strength and deformation resistance due to a denser arrangement of particles, but in this case the ballast has a smaller volume of voids. In the event of increased abrasion of the ballast, for example in the form of a shake, accompanied by the formation of fine particles (less than 0.01 mm), a decrease in the volume of the voids of the ballast prism can be critical for the drainage properties of the ballast.The article presents the test results of experimental technology for surfacing of the track ballast — surfacing with stone blowing carried out by specialists of the JSC “VNIIZhT” and the RUT MIIT (“Tracks and track facility” Department) in 2018. In October 2017 comparative tests of surfacing for under-sleeper pads and stone blowing were carried out under the conditions of the Test Ring of the JSC “VNIIZhT” which is close to the actual operating conditions. Then, three sections were laid in the operational area of the Test Ring — two tested (with surfacing for under-sleeper pads and stone blowing) and one reference. The need to continue researching exactly the stone blowing technology arose due to the fact that in October 2017, due to climatic conditions (air temperature fluctuations to negative values), it was not possible to obtain force track profiles and clarify the migration factors of blown crushed stone into track ballast.The test results confirmed the effectiveness of track surfacing with a stone blowing process. The use of new equipment allows improving this surfacing technology. As part of the tests, it was possible to find ways to counteract the migration of blown crushed stone into track ballast.https://www.journal-vniizht.ru/jour/article/view/399железнодорожный путьщебеночный балластвыправкаразделительная сеткапневматический суфляж
spellingShingle V. N. Kaplin
A. A. Abrashitov
E. N. Grin’
Technology and determination of the applicability of stone blowing at the current track maintenance
Вестник Научно-исследовательского института железнодорожного транспорта
железнодорожный путь
щебеночный балласт
выправка
разделительная сетка
пневматический суфляж
title Technology and determination of the applicability of stone blowing at the current track maintenance
title_full Technology and determination of the applicability of stone blowing at the current track maintenance
title_fullStr Technology and determination of the applicability of stone blowing at the current track maintenance
title_full_unstemmed Technology and determination of the applicability of stone blowing at the current track maintenance
title_short Technology and determination of the applicability of stone blowing at the current track maintenance
title_sort technology and determination of the applicability of stone blowing at the current track maintenance
topic железнодорожный путь
щебеночный балласт
выправка
разделительная сетка
пневматический суфляж
url https://www.journal-vniizht.ru/jour/article/view/399
work_keys_str_mv AT vnkaplin technologyanddeterminationoftheapplicabilityofstoneblowingatthecurrenttrackmaintenance
AT aaabrashitov technologyanddeterminationoftheapplicabilityofstoneblowingatthecurrenttrackmaintenance
AT engrin technologyanddeterminationoftheapplicabilityofstoneblowingatthecurrenttrackmaintenance