Universal method for calculation of reliable completion times
Usually the actual duration of construction projects significantly exceeds the scheduled durations.The reason is the lack of realistic scheduling. This paper presents a universal method for computing the reliable completion time for a construction project with network plans that have imprecise durat...
Main Author: | Yu.B. Kalugin |
---|---|
Format: | Article |
Language: | English |
Published: |
Peter the Great St. Petersburg Polytechnic University
2016-11-01
|
Series: | Инженерно-строительный журнал |
Subjects: | |
Online Access: | https://engstroy.spbstu.ru/userfiles/files/2016/7(67)/07.pdf |
Similar Items
-
Reasons of delays in construction projects
by: Yuri Kalugin
Published: (2017-10-01) -
Accelerate the Implementation Time of Kadiri University Clinic Constructions Projects Using Critical Path Method (CPM)
by: Muhammad Azhari Faiz, et al.
Published: (2021-01-01) -
SMART CRITICAL PATH METHOD AS A MODIFIED DETAILED SCHEDULING TECHNIQUE
by: Yasser M.R. Aboelmagd
Published: (2020-01-01) -
Scheduling workflows for scattered objects
by: Yuri Kalugin, et al.
Published: (2018-12-01) -
Application of Critical Path Method and Fuzzy Logic in Optimizing Bottled Drinking Water Production
by: Wanda Wira Yudiarti, et al.
Published: (2021-05-01)