Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach
The increasing number of construction projects together with the limited resources of organizations led to tough competition for achieving project goals. Time, cost, and quality have been known as the project iron triangle. Project managers attempt to allocate the appropriate resources and make the...
Main Authors: | Sayyid Ali Banihashemi, Mohammad Khalilzadeh, Jurgita Antucheviciene, Jonas Šaparauskas |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-08-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/11/9/387 |
Similar Items
-
Enhancing Contractor Selection Process by a New Interval-Valued Fuzzy Decision-Making Model Based on SWARA and CoCoSo Methods
by: Sajjad Karami, et al.
Published: (2023-07-01) -
A Dispatching-Fuzzy AHP-TOPSIS Model for Scheduling Flexible Job-Shop Systems in Industry 4.0 Context
by: Miguel Ortíz-Barrios, et al.
Published: (2021-05-01) -
Covid 19 Sürecinde Gıda Perakende Sektörünün Performans Değerlendirmesi: SWARA Temelinde TOPSIS Yöntemi ile Bir İnceleme
by: Tuğba Eyceyurt Batır
Published: (2022-10-01) -
Supplier Ranking in Dental Sector Using Integrated Fuzzy (AHP-TOPSIS)
by: Asma Mohammed Ali, et al.
Published: (2022-12-01) -
Objective Criticism and Negative Conclusions on Using the Fuzzy SWARA Method in Multi-Criteria Decision Making
by: Željko Stević, et al.
Published: (2022-02-01)