The On-site Verification of Key Technologies for Kunbei-Liuzhou-Longmen Hybrid Multi-terminal Ultra HVDC Project
Main Authors: | Hong Rao, Changyue Zou, Shukai Xu, Xipeng Cai, Yan Li, Xiaobin Zhao, Yuebin Zhou, Yu Yang, Wei Wei |
---|---|
Format: | Article |
Language: | English |
Published: |
China electric power research institute
2022-09-01
|
Series: | CSEE Journal of Power and Energy Systems |
Online Access: | https://ieeexplore.ieee.org/document/9862598 |
Similar Items
-
Analysis of the contribution of Liuzhou's local specialty food (Liuzhou Luosifen) policy to regional economic development
by: Jing Chen, et al.
Published: (2024-01-01) -
Design and implementation of passive impedance adapter to damp resonances between VSC‐HVDC and AC systems
by: Changyue Zou, et al.
Published: (2024-12-01) -
Probe into Guideline of Liuzhou Riverside Development along Liujiang
by: MA Zhao-hui
Published: (2007-01-01) -
Integrated Influence of Existing Projects on Backwater in Liuzhou City Section of Liujiang Waterway
by: HUANG Sheng-wei, et al.
Published: (2011-01-01) -
Model parameter identification for scaled-down analogous HVDC transmission lines using broad spectral response analysis
by: Jinrui Tang, et al.
Published: (2022-08-01)