Study on Cracking Causes of One 500 kV SSY Type Equipment Clamp
One SSY type equipment clamp serviced in a 500 kV station was found to be cracked. In this paper, the crcaked cause and mechanism is investigated by means of macroscopic morphology observation, fracture surface morphology observation, X-ray digital detection, metallographic observation. The results...
Main Authors: | Zheng Jianjun, Wei Yong, Liu Xiaokai, Han Kuo |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2024-01-01
|
Series: | E3S Web of Conferences |
Subjects: | |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2024/08/e3sconf_gesd2024_01001.pdf |
Similar Items
-
Cause analysis on fracture of a 500 kV composite insulator
by: LI Bocheng, et al.
Published: (2023-09-01) -
Cracking Analysis of a Brass Clamp Mounted on the Main Transformer in the Power Grid System
by: Jiahui Chen, et al.
Published: (2023-04-01) -
To clamp or not to clamp late?
by: Nicoletta Iacovidou, et al.
Published: (2013-01-01) -
Cause Analysis and Solutions About Abnormal Heating of Equipment Clamp
by: Zheng Jianjun, et al.
Published: (2023-01-01) -
FRACTURE ANALYSIS OF MAIN TRANSFORMER EQUIPMENT CLAMP IN NUCLEAR POWER PLANT
by: ZHANG HongWu, et al.
Published: (2022-01-01)