Development of a risk-based strategy implementation of a full pre-financed contractor scheme (CPF) in toll road projects to improve time performance
AbstractSeveral reasons underlie the use of Contractor Full Pre-Financed (CPF), which provides a much higher return opportunity than a standard payment contract system or the Monthly Certificate (MC). The case study in this research is one of the toll road construction projects in Indonesia that use...
Main Authors: | Mohammad Ichsan, Wisnu Isvara, Jodi Noor Handibyanto, Farras Ammar Muhammad |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2024-12-01
|
Series: | Cogent Engineering |
Subjects: | |
Online Access: | https://www.tandfonline.com/doi/10.1080/23311916.2024.2307212 |
Similar Items
-
Strategy development of contractor with Contractor Full Pre-Finance (CPF) scheme using risk-based approach to increase cost performance of toll road development projects
by: Wisnu Isvara, et al.
Published: (2023-12-01) -
How good is PERT? /
by: 305328 Geddes, Philip -
CRISPR/Cpf1 facilitated large fragment deletion in Saccharomyces cerevisiae
by: Li, Zhen-Hai, et al.
Published: (2020) -
Engineered DNase-inactive Cpf1 variants to improve targeting scope for base editing in E. coli
by: Zehua Chen, et al.
Published: (2021-12-01) -
Pengaruh model latihan UMAC-CPF dalam meningkatkan kelincahan pemain sepakbola cerebral palsy Indonesia
by: Fadilah Umar
Published: (2020-08-01)