Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank Model

The impounding of the dam is the step that will be done after construction work on the dam be finished. This study aims to determine a long time and the volume of inflow on Raknamo dam in dry water year, low water year, normal water year and wet water year with tank model. Factors that affected the...

Full description

Bibliographic Details
Main Authors: Denik S Krisnayanti, Margareth E Bolla, Wilhelmus Bunganaen, Alvine C Damayanti, Costandji Nait, Bilgardo E.D.N.R Amaral
Format: Article
Language:English
Published: Universitas Diponegoro 2020-07-01
Series:Media Komunikasi Teknik Sipil
Subjects:
Online Access:https://ejournal.undip.ac.id/index.php/mkts/article/view/26757
_version_ 1818453597020487680
author Denik S Krisnayanti
Margareth E Bolla
Wilhelmus Bunganaen
Alvine C Damayanti
Costandji Nait
Bilgardo E.D.N.R Amaral
author_facet Denik S Krisnayanti
Margareth E Bolla
Wilhelmus Bunganaen
Alvine C Damayanti
Costandji Nait
Bilgardo E.D.N.R Amaral
author_sort Denik S Krisnayanti
collection DOAJ
description The impounding of the dam is the step that will be done after construction work on the dam be finished. This study aims to determine a long time and the volume of inflow on Raknamo dam in dry water year, low water year, normal water year and wet water year with tank model. Factors that affected the time of the first impounding of the dam is the amount of rainfall and evapotranspiration that has come in to the catchment area. The total volume of annual inflow Raknamo reservoir obtained in dry water year was in 15,489 million m3, low water year equal to 23,696 million m3, normal water year equal to 32,892 million m3 and wet water year equal to 44,068 million m3. In the calculation of the length of time filling the Raknamo reservoir used the volume of low water year. The accumulation of the volume of every month calculated so that length of time filling the Raknamo reservoir can reach the volume of planned at 14.091 million m3 within three a half months (three months fifteen days).
first_indexed 2024-12-14T21:41:31Z
format Article
id doaj.art-ffcf656a675d45a683f405bbd13b9123
institution Directory Open Access Journal
issn 0854-1809
2549-6778
language English
last_indexed 2024-12-14T21:41:31Z
publishDate 2020-07-01
publisher Universitas Diponegoro
record_format Article
series Media Komunikasi Teknik Sipil
spelling doaj.art-ffcf656a675d45a683f405bbd13b91232022-12-21T22:46:28ZengUniversitas DiponegoroMedia Komunikasi Teknik Sipil0854-18092549-67782020-07-01261617210.14710/mkts.v26i1.2675717129Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank ModelDenik S Krisnayanti0Margareth E Bolla1Wilhelmus Bunganaen2Alvine C Damayanti3Costandji Nait4Bilgardo E.D.N.R Amaral5Nusa Cendana UniversityNusa Cendana UniversityNusa Cendana UniversityUniversitas BrawijayaUniversitas BrawijayaNusa Cendana UniversityThe impounding of the dam is the step that will be done after construction work on the dam be finished. This study aims to determine a long time and the volume of inflow on Raknamo dam in dry water year, low water year, normal water year and wet water year with tank model. Factors that affected the time of the first impounding of the dam is the amount of rainfall and evapotranspiration that has come in to the catchment area. The total volume of annual inflow Raknamo reservoir obtained in dry water year was in 15,489 million m3, low water year equal to 23,696 million m3, normal water year equal to 32,892 million m3 and wet water year equal to 44,068 million m3. In the calculation of the length of time filling the Raknamo reservoir used the volume of low water year. The accumulation of the volume of every month calculated so that length of time filling the Raknamo reservoir can reach the volume of planned at 14.091 million m3 within three a half months (three months fifteen days).https://ejournal.undip.ac.id/index.php/mkts/article/view/26757impoundingtank modelraknamo reservoir
spellingShingle Denik S Krisnayanti
Margareth E Bolla
Wilhelmus Bunganaen
Alvine C Damayanti
Costandji Nait
Bilgardo E.D.N.R Amaral
Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank Model
Media Komunikasi Teknik Sipil
impounding
tank model
raknamo reservoir
title Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank Model
title_full Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank Model
title_fullStr Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank Model
title_full_unstemmed Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank Model
title_short Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank Model
title_sort analysis of initial filling impounding into the raknamo dam with tank model
topic impounding
tank model
raknamo reservoir
url https://ejournal.undip.ac.id/index.php/mkts/article/view/26757
work_keys_str_mv AT denikskrisnayanti analysisofinitialfillingimpoundingintotheraknamodamwithtankmodel
AT margarethebolla analysisofinitialfillingimpoundingintotheraknamodamwithtankmodel
AT wilhelmusbunganaen analysisofinitialfillingimpoundingintotheraknamodamwithtankmodel
AT alvinecdamayanti analysisofinitialfillingimpoundingintotheraknamodamwithtankmodel
AT costandjinait analysisofinitialfillingimpoundingintotheraknamodamwithtankmodel
AT bilgardoednramaral analysisofinitialfillingimpoundingintotheraknamodamwithtankmodel